Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2024 at 8:00 PM
Updated September 10, 2024
Site work for a water / sewer project in Vermilion, Alberta. Completed plans call for site work for a water / sewer project.
SEEPAGE AND EROSION CONTROL MEASURES Vermilion Lake Dam Highway 41, North End of the Town of Vermilion in NE 31-50-06 W4M APPROXIMATE QUANTITIES: 1 Lump Sum Mobilization and Demobilization 1 Lump Sum Existing and Temporary Roads 1 Lump Sum Care of Water 950 Tonne Authorized Contaminated Topsoil and Overburden Disposal 1 Lump Sum Erosion and Sedimentation Control in Contaminated Area 2,125 Tonne Contaminated Soil Disposal 1 Lump Sum Disposal of Liquid Hydrocarbons 2,400 Cubic Metre Supply and Place Impervious Fill Zone 1A 220 Cubic Metre Supply and Install Gravel Zone 4C 175 Cubic Metre Repair of Erosion Rills 200 Cubic Metre Authorized Supply of Riprap Zone 6C 1 Lump Sum Concrete Wall Extension Concrete 1 Lump Sum Supply and Install Bulkhead and Accessories 200 Metre Supply and Install Chain Link Fencing 1 Lump Sum Supply and Install Bulkhead Storage Contractor to supply all materials. Documents can be obtained from https://purchasing.alberta.ca/
Award
Water / Sewer
$1,718,571.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2024
October 1, 2024
NE 31-50-06 W4M, Vermilion, AB
Related To This Project
Vermilion, AB
Bid Date: Jan 07 2025
Vermilion, AB
Bid Date: Jan 13 2025
Vermilion, AB
Bid Date: Feb 20 2025
Vermilion, AB
Bid Date: Apr 11 2025
Vermilion, AB
Bid Date: Jun 06 2025
Vermilion, AB
Bid Date: Jul 04 2025
Vermilion, AB
Bid Date: Jul 22 2025
Vermilion, AB
Bid Date: Aug 19 2025
Vermilion, AB
Bid Date: Jun 19 2019
Vermilion, AB
Bid Date: Jul 30 2024
Vermilion, AB
Bid Date: May 31 2024
Vermilion, AB
Bid Date: May 09 2024
Vermilion, AB
Bid Date: May 09 2024
Vermilion, AB
Bid Date: Apr 11 2024
Vermilion, AB
Bid Date: Apr 02 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
