Published September 12, 2024 at 8:00 PM
Updated October 1, 2024
Site work, paving, new construction and renovation of a mixed-use development in Ardmore, Pennsylvania. Completed plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; for the renovation of a elderly care / assisted living facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
General Construction; Mechanical HVAC Construction; Plumbing and Fire Protection Construction; Electrical Construction The project consists of the construction of a new Ardmore Avenue Community Center (AACC) and separate Bathhouse, the renovation and expansion of the Center for Positive Aging in Lower Merion (PALM), along with new site improvements at each site. The project will be constructed in five stages to maintain some level of service between AACC, Ardmore Pool Complex, Vernon V. Young Memorial Park, and PALM. Work at AACC, Pool Complex, and Park also includes, but is not limited to, building demolition; selective site demolition; site and building utilities (domestic water, fire, sanitary, stormwater, electric, and geothermal); playing field reconstruction; court construction; retaining wall construction; parking lot construction; landscaping; and other site improvements. Work at PALM also includes, but is not limited to, selective demolition; site and building utilities (domestic water, fire, sanitary, and electric, along with modification of existing gas service and stormwater); driveway reconstruction; sidewalks; and other site restoration and improvements. Add alternates are included (Splash Pad construction, etc). Award is planned for September 18, 2024 with Construction Notice to Proceed planned for October / November 2024 pending contract execution. First stage of onsite construction activities planned to begin late 2024 / early 2025. The last day for receipt of written questions is end of business day of Friday, August 23, 2024. Questions regarding the project scope shall be submitted via online. The Board of Commissioners reserves the right to reject any or all bids or parts thereof or to waive any informality or irregularity as deemed to the best interest of the Township. *Bidder have been added without amount, please refer Bid Tabulation for detailed bid result*
Bid Results
Elderly Care / Assisted Living
$22,000,000.00
Public - City
New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2024
January 1, 2025

122 Ardmore Ave, Ardmore, PA
Related To This Project
Ardmore, PA
Bid Date: Sep 05 2024
Ardmore, PA
Bid Date: Sep 10 2024
Ardmore, PA
Bid Date: Oct 22 2024
Ardmore, PA
Bid Date: Dec 19 2024
Ardmore, PA
Bid Date: Nov 14 2024
Ardmore, PA
Bid Date: Nov 14 2024
Ardmore, PA
--
Ardmore, PA
--
Ardmore, PA
Bid Date: Sep 05 2024
Ardmore, PA
Bid Date: Jun 13 2024
Ardmore, PA
Bid Date: May 09 2024
Ardmore, PA
Bid Date: Mar 21 2024
Ardmore, PA
Bid Date: Feb 22 2024
Ardmore, PA
Bid Date: Feb 22 2024
Ardmore, PA
Bid Date: Jan 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Ardmore Community Center - PALM Senior Center Replacement Renovation
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.