BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2024 at 8:00 PM

Updated September 28, 2024

Site work and paving for a road / highway in Encino, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For Ps&e Package Questions Call: Francisco Cantu 600 W Us 83 Expressway Pharr, Tx 78577 956/702-6155 Length: 1.28 MI Guaranty: 99,000.00 DBE Goal: 0.0 % For Questions Regarding a Proposal Call 512/416-2498 ------------------------------------------------------------------------------ County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Brooks 0818-01-020 Us 281 Fm 755 F 2b24(500) 7.5 Miles West of Us 281 Length: Miles Jim Hogg 0086-07-039 Sh 16 Sh 359 F 2b24(500) Old Cemetery Rd. Length: Miles Brooks 0255-05-048 Brooks/hidalgo Cl Us 281 F 2025(118) 3.1 Miles North of Fm 755 Length: Miles Willacy 0327-10-071 5.0 Miles South of Kenedy/willacy Cl Ih 69e F 2025(119) Kenedy/willacy Cl Length: Miles Willacy 0433-04-034 Fm 3142 Fm 2209 C 433-4-34 Sh 186 Length: Miles Jim Hogg 0482-01-040 Sh 16 Sh 285 F 2b24(500) Fm 1017 Length: Miles Willacy 0872-01-019 Bus 77 Ss 413 F 2b24(500) Fm 2629 Length: Miles Willacy 0872-01-020 Bus 77 Fm 506 F 2b24(500) Willacy/cameron County Line Length: Miles Hidalgo 1064-01-045 Fm 492 Fm 676 F 2b24(500) 0.2 Miles West of Sh 364 Length: 1.28 Miles Brooks 1103-01-016 7.5 Miles West of Us 281 Fm 755 F 2b24(500) Brooks/starr County Line Length: Miles Willacy 1588-02-004 Fm 2209 Fm 3142 C 15-88-24 Sh 186 Length: Miles Willacy 2119-01-009 Garcia County Rd. Fm 2209 C 21-19-19 Fm 3142 Length: Miles ------------------------------------------------------------------------------- TXDOT - Preventive Maintenance - FM 755 Contractor questions on this project are to be addressed to the following individual(s): Francisco Cantu, P.E., Roma Area Engineer; Francisco.J.Cantu@txdot.gov Danny Flores, P.E., Transportation Engineer; Danny.Flores@txdot.gov

Award

Roads / Highways

$5,005,656.00

Public - State/Provincial

Paving, Site Work

81

3

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
53
Bidding Soon
630
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

November 5, 2024

Project location map

Farm to Market Rd 755, Encino, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.