BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Fort Wayne, Indiana. Completed plans call for asbestos abatement for a educational facility; and for site work for a educational facility.

https://www.journalgazette.net/local/schools/fort-wayne-middle-schools-renovation-set-at-14-million/article_940775d0-7080-11ef-bc3e-dfe5591cf845.html This threshold was set Monday with the Fort Wayne Community Schools board’s approval of a contract amendment with CME Corp., which was appointed as construction manager for the Miami Middle School project in December. _____________________________________________________________________________________ The Project Base Bid consists of asbestos abatement throughout Miami Middle School which will include the proper isolation, removal, decontamination, and disposal of asbestos containing TSI pipe and fitting insulation, floor tiles, and/or floor tile mastics, assumed transite chalk boards and associated assumed asbestos adhesives, non-asbestos chalk/white boards, tack boards, wall board, and all associated assumed asbestos adhesives, transite teacher stations, transite laboratory table tops, transite counter tops, stainless steel sink coating. Each bid proposal shall be accompanied by a certified check, a cashier s check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of completion. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids.

Post-Bid

Educational

$240,000.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
59
Bidding Soon
603
All Active Projects
298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

December 23, 2024

img_map_placeholder

8100 Amherst Dr, Fort Wayne, IN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.