BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Columbia, Kentucky. Completed plans call for site work for a pipeline.

Contractor shall furnish all materials, equipment, labor, and reclamation necessary to complete the construction of the specified contract described in the contract documents and plans. Time of completion for the contract is as listed above. Questions should be directed to Steve Harris or Tucker England, preferably by email which can be found on the attached sign-in sheet. Question cut-off date is hereby set to Friday, August 2nd, 2024, at 12:00 PM CST. The Project includes the following Work: Relocation of approximately 1,400 LF of 4" steel high pressure natural gas line, the installation of a new regulator station, and the installation of approximately 4,600 LF of low pressure natural gas line. The work includes all materials, appurtenances, labor, testing and equipment necessary to complete the project. The project will be separated into two contracts. Contract 'A' includes the relocation of the 4" steel high pressure natural gas line. Contract 'B' includes the installation of the 4" polyethylene low pressure natural gas line and the new regulator station. Contract 'B' has an expected duration of 90 days.

Post-Bid

Pipeline

$85,000.00

Public - City

Site Work

13

17

20

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
37
Bidding Soon
577
All Active Projects
252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Columbia, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.