BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work and new construction of a detention facility in Chester, Illinois. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

Description Construct new Boiler room/ Utility House Estimate Less than 30,000,000 PN - 120-175-148 Phase 2 The project consists of building a new Boiler Room/Utility House outside the secure wall/fence. The new building will house high-low pressure steam boilers that will serve heating and process loads for the entire maximum-security campus as well as domestic water heating boilers will be located within the new utility house. The project also includes redundant diesel engine generators located in a secure fenced area outside the new utility house to serve to entire correctional center. 14% MBE, 5% WBE and 3% Combined VBE/PBE goals

Award

Jails / Prisons

$24,208,000.00

Public - State/Provincial

New Construction, Site Work

181

28

40

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
89
Bidding Soon
1,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

November 18, 2024

Project location map

711 E Kaskaskia St, Chester, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.