BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sellersburg, Indiana. Completed plans call for site work for a road / highway.

The Work consists of the following 1. The Work includes the construction of approximately 900 feet of new entrance drive, including a roundabout and a masonry entry monument. Project consists of concrete curb and gutter, concrete walks, paving, landscaping work, masonry/cast stone monument and signage, plumbing and electrical work. Ivy Tech Sellersburg Secondary Entrance Road All contractors shall have Indiana Certificate of Qualification for Public Works Projects per Indiana Code IC 5-16-13 prior to beginning construction on site. A contractor of any tier is EXEMPT from this requirement if the total amount of their work awarded is less than Three Hundred Thousand dollars ($300,000). The successful bidder, offered a Contract, is required to provide Performance and Payment Bonds from an acceptable surety, each in an amount equal to 100 percent of the Contract Sum prior to execution of the Contract. The Owner reserves the right, at its discretion, to waive any technicalities in bidding so long as the intent and purpose of this notice has been fulfilled. Each Bidder is responsible for inspecting the Project site and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. All prices quoted are to be free of all Federal Excise Taxes and State Sales Tax, and upon request of supplier, tax exemption certificate will be executed by the Owner to the successful bidders to cover all items subject to these taxes. The Owner reserves the right to accept the Bid which, in the Owner's judgment, is the lowest responsible and responsive bid, or rejects all bids. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract, the Owner may then declare the bid deposit and/or bond forfeited as liquidated damages, but not as a penalty. Bids may not be withdrawn for a period of sixty (60) calendar days after the opening of bids.

Award

Roads / Highways

$1,444,612.00

Public - City

Paving, Site Work

31

17

14

10

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
63
Bidding Soon
1,059
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

img_map_placeholder

8204 Hwy 311, Sellersburg, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.