BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Los Angeles, California. Contact the soliciting agency for additional information.

Test, repair, and refurbish, 1 each, generator lower guide bearing, size: 9.00 inches diameter by 13.50 inches length based on approximate dimensions, in accordance with the attached document titled specification for san fernando power plant unit 2 lower guide bearing refurbishment. Services prequested for the lower guide bearing include, but are not limited to: performing non-destructive ultrasonic and liquid penetrant testing to identify cracks, delaminations, metal base to babbitt material debonding, and other defects; performing bearing vertical joints and outer diameter re-pinning and alignment; removing existing babbitt material; pouring new babbitt material; and finish machining bearing babbitt inner diameter to ladwp specified dimensions and tolerances. Perform non-destructive examination, ultrasonic and liquid penetrant testing, in accordance with the requirements of the attached drawing no. 2664-000300/h9 mu2. Remove existing babbitt and rebabbitt with astm b23, grade 2 babbitt. Bearing clearance shall be machined to 0.002 inches per inch of shaft journal diameter per electrical apparatus service association technical manual, section 8.6, bearing clearance, generator shaft journal outer diameter maximum measured at 8.980 inches. Match bearing oil flow features and geometry dimensions to existing conditions, including but not limited to, grooves, slots, ports, side-wells, and oil slingers. Create and submit drawing(s) of lower guide bearing that comply with asme y14.5-2018 standard. Submit a comprehensive final lower guide bearing service report containing in detail the results of all non-destructive examination tests, chemical analysis tests reports, repair shop tests, and as-found and as-left measurements sheets. Los angeles department of water and power will arrange transportation of the lower guide bearing to contractor facility and pick up of the lower guide bearing from contractor facility. The contractor shall ensure the bearing is properly boxed, crated, or otherwise protected to prevent any damage in transit and in storage. Machined finishes in all bearing parts shall be lubricated and/or coated to prevent metal oxidation in transit and in storage, as applicable. All questions shall be submitted through electronically. The department reserves the right to reject any and all bids.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
95
Bidding Soon
2,211
All Active Projects
976
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 6, 2024

img_map_placeholder

Multiple Locations, Los Angeles, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.