BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2024 at 8:00 PM

Updated October 25, 2024

Site work and paving for a mixed-use development in Wildwood, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed scope of work includes minor pavement repairs, coldmilling and resurfacing the roadway, and intersection improvements including new curb, decorative crosswalks, ADA compliant curb ramps, traffic signal modifications, and other appurtenances along Manchester Road from Route 100 to west of Wildwood Crossing; along Taylor Road / Village Hills Parkway from Victoria Crossing to Route 100. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Wildwood reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 11%. No second tier subcontracting will be allowed on this project. MODOT - Manchester Road and Taylor Road Resurfacing, Traffic Signal, and ADA Upgrades The DBE Goal for this project is 11%.

Award

Roads / Highways

$2,985,989.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
0
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 30, 2024

Project location map

Multiple Locations, Wildwood, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.