BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a multi-residential development in Winter Haven, Florida. Working plans call for the demolition of a 5,772-square-foot, two-story above grade multi-residential development; and for site work for a multi-residential development.

**As of September 17, 2024, The City of Winter Haven has determined that due to a change in circumstances it is in the City's best interest to reject all bids. Location: 110 Avenue A NE Winter Haven Description Demolition & clearing of 110 Avenue A NE, Winter Haven. A two-story, wood frame, 5,772 sf multi-family-residence (MFR) To include block wall along south side of the property, any foundation, walkway, construction debris/junk/trash, as applicable. Prices must be valid for 90 days. The service of a licensed contractor with asbestos remediation experience is requested to properly perform demolition to include, without limitation: Dismantle, remove and dispose of the MFR on this property, including the 6-foothigh block wall along the south side of the property, and any foundations and/or walkways. Removal of all junk, trash, debris, and materials on lot. Perform clean-up, leaving the demolition site clear of any debris. Furnish any required clean fill dirt and regrade the jobsite leaving the lot vacant and ready to build. NESHAP regulations must be followed. A Notice of Demolition (Form 62-257.900) must be furnished to FDEP and a copy must be provided to the City prior to commencing demolition. GENERAL DESCRIPTION OF WORK Unless otherwise specified, the Contractor shall: 1. Obtain a demolition permit from the City of Winter Haven Building Department. 2. Disconnect all utility services under City's supervision before demolition. 3. Complete and submit a Notice of Demolition (Form 62-257.900) to FDEP. A copy must be provided to the City prior to commencing demolition. 4. Demolish, remove, and dispose of the structure, foundation, steps, and/or walkways. 5. Remove all materials from the demolition site in accordance with federal, state and local regulations. Including any asbestos materials as listed on the attached Asbestos Survey Report. 6. Remove and dispose of appliances and other items that may contain refrigerants, including refrigerators, freezers, dehumidifiers, portable air conditioners, and central air conditioners, in accordance with Code of Federal Regulations, Title 40, Part 82. 7. Remove and legally dispose of mercury-containing materials including fluorescent, high-pressure sodium, mercury vapor, metal halide bulbs, and thermostats containing a liquid filled capsule. 8. Perform site clearing and grading. Final grading shall be level.

Final Planning

Multi-Residential

$200,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
96
Bidding Soon
1,495
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

March 17, 2025

img_map_placeholder

110 Avenue A NE, Winter Haven, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.