Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

The contractor will be responsible for the following tasks: 1. Mobilization and Demobilization of equipment; 2. Hydrographic Surveying; 3. Maintenance dredging of Area A to a required elevation of -12 feet MLLW, Area B to -11 feet MLLW, and Area D to -6 feet MLLW, including transport and placement of all material at SF-08 or a permitted upland disposal site; 4. Purchase and installation of five PATONs (Private Aids to Navigation), specifically three red nuns and two green cans, either Sealite SL-B700 or equivalent with approval from the Harbormaster. The total work duration is set at 20 calendar days from the notice to proceed until substantial completion, followed by an additional 10 calendar days until final completion. The estimated cost for this project is $515,000. The contract work must be completed within a total of 30 calendar days: 20 days for substantial completion and an additional 10 days for final completion. Place of Performance The contract will be performed at the SF Marina West Harbor located at 1 Marina Green Drive, San Francisco, CA 94123. All in-water work activities must be completed by November 30, 2024. Question Deadline 07/31/2024 at 5:00 PM PT Questions Due - mailed to cort.eidem@sfgov.org and cc bridget.webster@sfgov.org

Bid Results

Water / Sewer

$182,500.00

Public - City

Site Work

6

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
190
Bidding Soon
2,905
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

September 6, 2024

Project location map

1 Marina Green Dr, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.