EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 31, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.

The manner and on the date hereinafter specified for the furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for the construction as set forth in the specifications and as shown on the drawings for as prepared by JRA Architects and approved by the Construction Procurement Section and under the terms and conditions of this Invitation. Training physicians and other healthcare professionals to practice statewide in Kentucky is of major importance and to do that effectively, the College of Medicine and other healthcare colleges at the University of Kentucky need the space available to grow the number of medical/healthcare students to meet the needs of the Commonwealth. As part of the College's planned growth strategy, this would establish a world-class medical education facility that will become the hub of medical education in the Commonwealth and beyond. The project consists of a 520,000 sqft,10 story structure. This package consists of the following trade package: TC-019 Site General Trades TC-020 CIP Shafts and Decks TC-021 Masonry TC-022 Fireproofing METHOD OF RECEIVING BIDS :Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner described herein and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section and in the following order: 1. Form of Proposal (Bid Form) 2. Bid Bond Please ensure there are no staples (check your bid bond) METHOD OF AWARD :Recommendation for award of Contract will be made on the basis of the lowest responsible bid provided by a bidder determined to be capable ("responsible") in all respects to perform the scope of work as the best value to the University. SCHEDULE OF PROJECT :The time for substantial completion for all phases shall be Nine Hundred Forty-Six (946) consecutive calendar days and Final Completion shall be Thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site cleaned up, and fully functional All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be quoted by all bidders (see bid breakdown form). This P&P bond may be required to be furnished by the successful bidder as a condition of the contract and will be determined following the post bid review. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Should any of these references disagree, the Special Conditions prevail. Document notes: Plans, Specifications and Official Bid documents are no longer available from the University of Kentucky, Construction Procurement Division. The University and Lynn Imaging have an agreement for duplicating and distribution services for University construction projects. Plans, Specifications and Official Bid Documents are available from: Lynn Imaging 328 Old Vine Street Lexington Kentucky 40507 Phone (859) 255-1021 Fax (859) 233-1558 In addition, Lynn Imaging and the University have a web site at online where plans can be ordered. Payments for Plans, Specifications and Official Bid Documents must be made to Lynn Imaging before a set of documents will be issued. Notes: Contractors that receive plans and specifications from other sources than Lynn Imaging must request a "Form of Proposal" from the University's Purchasing Representative to be registered as plan holders and to receive addendums. Potential Contractors must identify the position of their firm as a prime bidder, miscellaneous subcontractor, material supplier or other when ordering of picking up Plans and Specifications. BID SUBMITTAL :Contractors must submit their bid in a sealed envelope in Room #322 Peterson Service Building, Lexington, Kentucky 40506-0005 and the envelope must contain the following information on the outside lower left-hand corner: Bids, upon their receipt by the University of Kentucky, Construction Procurement Section are stamped showing the hour and date received. Bids received after the scheduled closing time for reception of bids will not be considered provided legal and accepted bids have been received on said referenced Invitation. BID WITHDRAWAL :No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum may not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. RIGHT TO REJECT :The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to Construction Procurement, no later than 08/15/2024 at 1:00 PM Lexington, KY Time. Written questions can be submitted by email to Ken Scott at cckbidquestions@uky.edu. Please use the bid number and title in the 'Subject' line of your email. Note: Responses to Written Questions received no later than 08/15/2024 will be provided in an addendum issued on or about 08/22/2024. POST BID MEETING : The apparent low bidder will be required to meet with the Project Team to review the bid and scope of services. The time and place of this meeting will be announced after the bid opening. Bid Results TC-019 Site General Trades . E.C. Matthews Co - $2,327,600 TC-020 CIP Shafts and Decks TWL Concrete -$9,990,000 TC-021 Masonry Mason Structure, - $389,330 TC-022 Fireproofing Alpha Insulation & Waterproofing - $2,647,477

Bid Results

Educational

$15,354,407.00

Public - State/Provincial

Renovation

302

30

83

6

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Curtain Wall and Glazed Assemblies, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Sound, Vibration, and Seismic Control
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Rigid Paving, Planting, Planting Preparation, Mulching
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Slings

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
38
Bidding Soon
748
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 28, 2024

img_map_placeholder

1449 University Dr, Lexington, KY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct Health Education Building PB-04C

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.