BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in High Ridge, Missouri. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; and water / sewer project.

ANTICIPATED AWARD DATE Four weeks after bid due date Project Overview The Jefferson County Department of Parks and Recreation is seeking an experienced company to design and construct: o (A) Pickleball Expansion Courts two (2) o (B) Stormwater Remediation of the area o (C) Entrance Improvement - Remove, Replace as part of water control o (D) Repair and resurface current courts three (3) with polymer surfacing coating Project Scope Design and install two (2) Pickleball Courts adjacent / west of the current pickleball courts. This will include post, netting, painting and perimeter coated fence. Design and effectively manage stormwater from the area as indicated on the attachment and at the Pre-bid meeting. Remove and replace the current asphalt entrance to assist in managing the stormwater flow from the area. . General Project Specifications General Conditions: The contractor shall comply with the general conditions as defined below: a. The contractor shall comply with all applicable codes as defined by the Jefferson County Department of County Services, Division of Code Enforcement, and the ADA. b. At the conclusion of the project, the contractor shall provide the owner with an "As Built / Designed" drawing. c. The contractor shall be responsible for all utility connections to the Access Control Gate. d. The contractor shall complete the project and have all material and equipment removed from the sites within one-hundred eighty (180) workdays from issuance of "Notice to Proceed", exceptions made for weather. e. The County will furnish a sales tax exemption certificate to the contractor for the County. The tax exemption will apply to the prime Contractor, subcontractors, and suppliers of materials and supplies incorporated or consumed during the construction of the project. f. The Contractor and all Subcontractors must comply with 290.500 RSMo et. seq. and pay the appropriate prevailing hourly wage rate for all covered workers who perform Work under the Contract. Sub-Contractors: The contractor shall not allow a sub-contractor on the worksite without the following: a. The sub-contractor shall be identified within the submitted bid documents. Sub contractors not identified within the contract documents shall not be allowed on the work site. If an alternate subcontractor is required, the contractor shall submit a written request to the Department Director requesting permission to use an alternate subcontractor. The contractor shall not use the alternate subcontractor without approval from the director. b. The contractor confirms that all subcontractors and alternate subcontractors shall be required to comply with all terms and conditions defined within the specifications and contract. c. The contractor shall be responsible for all activities of subcontractors and alternate subcontractors, employees, and representatives. Site Work: The contractor shall be responsible for the specific items defined below. i. ii. The contractor shall be responsible for the conditions of the work site and be responsible for all safety issues and responsible for assuring that the work site is compliant with all applicable federal and state work laws and regulations. The contractor shall be responsible for daily site clean-up. iii. The contractor shall be responsible for removing / mitigate all hazards. iv. The contractor shall be responsible for installing / maintaining an orange-colored construction fence around the construction site to ensure such site is secured while the installation is underway. v. The contractor shall be responsible to secure all necessary permits. vi. The contractor is responsible for all post construction cleanup of the work site; including any trees and brush removed for this project as well as all construction debris. vii. The contractor is responsible for the legal disposal of any hazardous waste. viii. All adjacent areas shall be returned to pre-existing conditions prior to final payment.

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
43
Bidding Soon
801
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

December 27, 2024

img_map_placeholder

2800 Community Ln, High Ridge, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.