BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Pleasanton, California. Completed plans call for site work for a water / sewer project.

Requests for Information are due at 3:00 pm on Tuesday September 10, 2024 DESCRIPTION OF THE WORK. This project is a joint project between the District and the City of Pleasanton. The District is the sole contracting agency. The Work consists of, in general, drilling, constructing, developing, and testing up to three (3) test wells at up to three (3) different locations within the city of Pleasanton. The work includes but is not limited to, drilling up to three (3) 8-inch diameter exploratory borings to approximately 800 feet below ground surface at three different sites using a combination of casing-advance and mud rotary drilling methods, providing representative samples at a minimum of 5-foot intervals, preparing the holes for geophysical logging, reaming out a portion of the holes to 14-inch diameter, installing up t three (3) 8.625-inch minimum outside diameter (O.D) mild steel casing wells with specified screen intervals, developing the wells, and assisting with well testing at the direction of the District or the representative of the District. Submittal of progress reports to the project manager on a monthly basis is required. Contractor shall report the actual footage of materials used including well riser casing, screen, filter pack, bentonite, 10.3 sack cement at the conclusion of each site. Work also includes, but is not limited to: a. Contractor to contain all water and wastes generated as a result of the project and haul off site and dispose of in compliance with all laws and regulations including disposal at facilities that will accept the specific wastes. Contractor to provide all water, power, fencing, and sanitation facilities required to do the Work. b. Contractor shall furnish and install all new equipment as specified in the Contract Documents. Bidding Documents contain the full description of the Work. The Engineer's estimate for this Contract is approximately $1,100,000. CONTACT INFORMATION. Mailing address: Zone 7 Water Agency 100 North Canyons Parkway Livermore, CA 94551 Project Manager: Jacob Danielsen Telephone: (925) 454-5081 E-mail: jdanielsen@zone7water.com Work shall be finally completed within 180 Calendar Days from the date when Contract Time commences to run. The contract time is anticipated to commence on or about October 28, 2024

Award

Water / Sewer

$1,400,871.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
47
Bidding Soon
1,907
All Active Projects
832
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

October 28, 2024

img_map_placeholder

5997 Parkside Dr, Pleasanton, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.