Saving Project...

Published September 13, 2024 at 8:00 PM

Updated September 15, 2024

Site work for a water / sewer project in Middle Township, New Jersey. Completed plans call for site work for a water / sewer project.

Proposals must be made on the standard Proposal Forms in the manner designated in the Bid Documents, must be enclosed in sealed envelopes bearing the name and address of the Bidder, and the name of the work on the outside addressed to Clerk, Borough of Wildwood Crest; and must be accompanied by a statement of Consent of Surety from a surety company authorized to do business in the State of New Jersey and acceptable to the Borough and either a Bid Bond, Certified or Cashier's Check drawn to the order of the Borough of Wildwood Crest for not less than ten percent (10%) of the amount bid, except that the check need not exceed $20,000.00. The successful bidder is hereby notified that a performance bond for the full amount of the project is required. The successful bidder will be required to execute a contract for the performance of the said work or the furnishing of said material or both, as the case may be, and a surety bond to be executed by a reliable surety company in a sum equal to the amount of the contract price for said work and/or material, guaranteeing the performance of the contract, which surety bond and contract shall be approved as to form and execution by the Borough Solicitor. The bidders shall also be required to comply with the following: A. Affirmative Action requirements (N.J.S.A. 10:5-31 et. seq.and N.J.A.C. 17:27). B. Certification Pursuant to P.L. 2012, C.25 (no investment activities in Iranianfinancial or energy sectors) C. The provisions of the New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25 et.seq). D. Americans with Disability Act of 1990, Title II (42 U.S.C. S121 01). E. Worker and Community Right-to-Know Act (N.J.S.A. 34:5A-1). F. Stockholder Disclosure Certification (P.L. 1977, C.33, N.J.S.A. 52:25-24.2). G. Business Registration Certification (N.J.S.A. 52:32-44). H. Public Works Contractors Registration (N.J.S.A. 34:11-56.48). I. Consent of Surety (N.J.S.A. 40A:11-22). J. Addendum Acknowledgement (N.J.S.A. 40A:11-23c. 1), 2) &3)). K. Subcontractors List (N.J.S.A. 40A:11-16). The award of the contract for this project will not be made until the necessary funds have been provided by the Borough of Wildwood Crest in a lawful manner. The Borough of Wildwood Crest reserves the right to consider the bids for sixty (60) days after the receipt of said bids. The Borough of Wildwood Crest also reserved the right to reject any or all bids or to waive any informalities in the best interest of the Borough of Wildwood Crest. Each proposal and bid must be submitted in accordance with the terms of the aforesaid specifications, must be made on standard proposal forms contained in the bid documents and shall be delivered to the place and hour mentioned above. Bidders will be furnished with a copy of the Bid Documents by request upon proper notice and payment of a non-refundable charge of $75.00 payable to DeBlasio & Associates, P.C., for reproduction and processing.

Award

Water / Sewer

$5,377,187.00

Public - City

Site Work

41

20

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Millwork
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Plastic Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Exterior Protection
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Public Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
58
Bidding Soon
1,230
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 10, 2024

img_map_placeholder

Multiple Locations, Middle Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.