BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work and paving for a bridge / tunnel in Modale, Iowa. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.ktiv.com/2025/07/22/bridge-over-i-29-near-onawa-close-thursday/ Bridge over I-29 near Onawa to close Thursday By Ariel Pokett Published: Jul. 22, 2025 at 4:46 PM GMT+5:30|Updated: 21 hours ago ONAWA, Iowa (KTIV) - The DOT announced on Monday that the Iowa 175 bridge will be closing on Thursday, July 24. According to a release, crews will be making emergency repairs due to multiple hits to the structure. Three of which have occurred in the last four months. The work may result in some lane closures on I-29 as well. Once finished, the lane closures that have been in place on the bridge will end. The work is expected to be complete by Aug. 5. A detour will be posted for drivers to follow. A detour will be posted for drivers to follow.(Iowa DOT) In the meantime, drivers will be able to follow a detour utilizing Blencoe/Monona County Road E-60 and Whiting/Monona County Road E-24. ------------------------------------------------------------------------------------------------------------------------------------ I 29: At the US 30 Interchange (SB) As of November 17, 2025, the project is in Conceptual status. Anticipated letting Year is 2029. IADOT - Bridge Rehabilitation - I 29 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$2,960,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
91
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2027

Project location map

I-29, Modale, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.