BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Aurora, Colorado. Contact the soliciting agency for additional information.

Sources Sought Notice Sources Sought Notice Page 5 of 5 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 5 This is NOT a solicitation or request for quote (RFQ). This is NOT a request for proposal (RFP). This is NOT a job advertisement for hiring employees. The VA is seeking QUALIFIED VENDORS to provide a very brief response to this notice including only just what is asked for in this notice below. This is sources sought notice to industry and the only information is posted on Contract Opportunities web page at SAM.gov. Sources sought means seeking qualified vendors. The attachments included on the Contract Opportunities page do not include any additional information. If your company is interested please read this notice entirely and submit the required information, as requested herein. Boiler Program Development that is in Compliance with VHA Directive 1810 Rocky Mountain Regional VA Medical Center, Aurora, Colorado BRIEF SCOPE OF WORK (This is for information only) IMPORTANT NOTE: This Sources Sought is for market research purposes only (to determine the socioeconomic status of interested companies). No award will be made off this posting. VA Medical Center in Aurora, Colorado is seeking qualified vendors who have an interest and capability of developing a boiler program that will keep the Rocky Mountain Regional Medical Center (RMR VAMC) in compliance with VHA Directive 1810. The contractor shall provide all tools, equipment, labor, supervision, transportation, project management, and materials to do conduct the replacement. Statement of Work Objective: To bring RMRVAMC into compliance per VHA Directive 1810 January 4, 2023 and the VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition January 2023. Combustion Analysis/Tuning Semi-Annually Pressure Relief Valve Replacement and Certification 6-year Inspection and Magnetic Particle Testing Service Hours for H Stamp Welding, Testing, and Certification Equipment Boilers Boiler #1: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-1 Boiler #2: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-2 Boiler #3: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-3 Boiler #4: Cleaver Brooks; Model No. 4WI-200-700-200ST; Serial No. T3786-1-4 Deaerator Tanks De-Aeration tank: Cleaver Brooks, Spray master; Model No. SM-4000; Serial No. T3786-5-1; 100,000 lbs/hour capacity Condensate/Surge Tank Condensate/Surge Tank: Cleaver Brooks; Model No. SRG-4096-4F; Serial No. T3786-6-1; 4,096-gallon capacity Combustion Analysis/Tuning (Semi-Annual) The inspections, testing, and adjustments shall comply with: The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual. The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices. Burner performance requirements in this document. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract. Test the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Adjust as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VA requirements (see below) and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. Immediately inform COR and POC of any recommended repairs, modifications, or safety related problems. List of interlocks and safety devices to be inspected and tested on each boiler/burner: High and low fuel pressure switches (gas/oil). Low fuel oil atomizing media (steam/compressed air) pressure switches. Low differential pressure switch, atomizing media/fuel oil (if provided by burner manufacturer). Oil burner position switch (if provided by burner manufacturer). Fuel safety shut off valves proof of closure (over-travel/valve seal switch). Leak test fuel safety shut off valves (main and pilot burners) (leakage into burner). Leak test gas fuel vent valves. Forced draft motor interlock. Forced draft damper wide-open interlock for purge. Outlet damper open interlock for purge (if outlet damper provided). Purge airflow interlock. Purge timing. Ignition timing. Low fire position interlock if present. Combustion airflow interlock. Main flame out time to close fuel valves. Ignition flame out burner shutdown. Scanner not sensing ignition spark (ultraviolet scanner). Scanner not sensing hot refractory (infrared scanner). Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm) Maximum NOx (Nitrous Oxide): Refer to original burner specification. Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing). No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations. Flames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls. Pressure Relief Valve Replacement & Certification Pressure Relief Valve Replacement Labor, equipment, and supporting material costs to remove current valves, replace and install the new valves listed below: 8 EA 1 A 1/2 Kunkle 6030HGE01-AM 4 EA 2 Kunkle 6252AKH01-AS 3 EA Kunkle 6252KNM01-LS 2 EA Kunkle 6252ALJ01-LS 10 EA Ashcroft 04V012VASS50 Block & Bleed Valves Labor, equipment, and material costs to bench test and certify the following removed valves and return to the Government: 8 EA 1 A 1/2 Kunkle 6030HGE01-AM 4 EA 2 Kunkle 6252AKH01-AS 3 EA Kunkle 6252KNM01-LS 2 EA Kunkle 6252ALJ01-LS 10 EA Ashcroft 04V012VASS50 Block & Bleed Valves Repair and Replacements due to Bench Test Failures Vendor to supply quote for replace/rebuild of any valve(s) that failed the bench test requirement in section 4.1.2 Inspection and Magnetic Particle Testing Annual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required. All inspections to be completed on the base year and will be the top priority of the contractor s proposed schedule. Contractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. Feed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand. Coordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections. Boilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection. VAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection. The boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work. The inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 7th Edition. Repairs and Re-Inspections Repairs Contractor to provide quote (to include subsequent re-inspection) to COR within 5 business days of discovery for all deficiencies identified through inspections required as part of section 6.1. All repairs must be approved and coordinated with COR prior to scheduling any work. Contractor to provide repairs not to exceed $25,000 per year of contract and all testing/certification documents within 10 business days. Emergencies Contractor to provide up to 6 emergency (after hours and/or weekend/holiday) call outs per year of contract. Contractor to provide quote for any emergent repairs needed within 24 hours of site visit to the COR via email. Contractor to provide emergent repairs not to exceed $15,000 per year of contract and all testing/certification documents within 10 business days. Summary of the minimum inspection requirements for boilers: Review the boiler history including operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks. The contractor is expected to do this work on station. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. Inspect foundations for signs of stress such as cracking or movement. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Set combustions for boilers number one, two, and three, on natural gas and number two oil. Test all safety devices and perform annually required accumulation tests on boilers one, two and three. Verify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions. Inspect seating surfaces of man ways and hand holes. Check that boiler structure is plumb and level with no excessive deformations. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of burner assembly. Inspect furnace for evidence of flame impingement. Test operation of water level gage glass. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually. Verify that steam pressure gage is properly calibrated. Test operation of high steam pressure cutouts on hot boilers by raising steam pressure. Inspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ). Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions. Inspect valves on boiler feed water, blow down, drain and steam systems. Perform service and Calibration of boiler instrumentation and controls. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions. Summary of the minimum inspection requirements for Feed water Deaerators: Review the feed water de-aerator history including operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications. Assess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes. Test hazardous gas monitoring system. Inspect for evidence of leakage. Note feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy. Inspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases. Inspect support structures for proper integrity and allowance for thermal expansion. Internal Inspections: Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking. Inspect spray nozzles and trays. Period of Performance This requirement is for one (1) Base Year and four (4) Option Years. Place of Performance All work will be performed at Rocky Mountain Regional VA Medical Center at 1700 N. Wheeling Street, Aurora, Colorado, 80045. Records Management Language This clause applies to all contractors whose employees create, work with, or otherwise handle Federal records, as defined below: Federal Record as defined in 44 U.S.C. 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the information value of data in them. The term Federal Record: Includes (Agency) records. Does not include personal materials. Applies to records created, received, or maintained by Contractors to the (Agency) contract. May include deliverables and documentation as associated with deliverables. Additional Requirements: 11. TRAINING: All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. The work will be performed for the following locations: Rocky Mountain Regional VA Medical Center 1700 North Wheeling Street Aurora, CO 80045 IMPORTANT NOTE: This RFI (Request for Information) is for information only. No award will be made from this RFI. QUALIFIED VENDOR: A qualified source has the a) necessary equipment, vehicles, personnel, resources and current operations as well as b) recent experience (within past 3 years) of performing services of a comparable size, scope and complexity, AND c) OEM certified technicians to perform services with unrestricted access to the facility during inclement weather, as well as immediate access to OEM software updates. A qualified source also has current and valid registration in System for Award Management (SAM), https://www.sam.gov). A qualified source will also be able to comply with Limitations of Subcontracting pursuant to FAR 19.507. Please communicate via e-mail to Chris.Hollingsworth@va.gov by 2:00 PM MST on August 9, 2024 as to your company s ability to perform service per this brief Scope of Work. If interested, please provide the following: Provide company s capability statement describing ability to provide preventative maintenance services as outlined above Please state your company s business size in relation to NAICS Code 238220 and provide your socio-economic category if applicable Please provide your UEI number If you have an FSS/GSA contract that includes this service Provide FSS/GSA contract number if applicable Indicate whether your company will self-perform services or state whether a third-party service provider will be utilized to provide the required services (note: Limitations on Subcontracting FAR 52.219-14, VAAR 852.219-74, 852.219-75, 852.219-77) If a subcontractor will be utilized, provide their company name, socioeconomic category, and UEI Only written responses, to items 1 through 7 above, will be accepted at this stage. Information is being gathered for market research purposes only. Industry exchanges and vendor teleconferences are at the discretion of the Contract Specialist. This is not a request for quotes. DISCLAIMER: This is a Request for Information (RFI) from industry in accordance with Federal Acquisition Regulation (FAR) 15.201(e) and on the requirement, that exists for the VA Medical Center(s) identified in this RFI. This is not a request for quote and not a contract. This announcement is not a request for proposals; therefore, responses to the RFI are not considered offers and cannot be accepted by the Government to form a binding contract. This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responders are solely responsible for all expenses associated with responding to this RFI. No classified information should be included in the RFI response. Should you have concerns regarding this RFI you may request to contact the Contracting Office that will be assigned this requirement by emailing the sender of this RFI. Questions must be addressed in writing to the Contract Specialist. Requests for VA-business sensitive information, to include VA budget information, VA acquisition planning information, acquisition methods, strategies and set-asides must be addressed via the VA FOIA process: https://www.va.gov/foia/ Thank you for your interest in doing business with the VA. To learn more about the VA Mission, Vision, Core Values & Goals visit https://www.va.gov/about_va/mission.asp To understand the latest updates on the Veterans First Contracting Program visit https://www.va.gov/osdbu/verification/veterans_first_contracting_program_adjustments_to_reflect_the_supreme_court_kingdomware_decision.asp To find out how to do business with the VA visit https://www.va.gov/osdbu/library/dbwva.asp To become a CVE-verified VOSB or SDVOSB visit https://www.vip.vetbiz.va.gov/ The Method of Contractor Selection has not been determined at this Time.

Conceptual

Medical

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
112
Bidding Soon
1,668
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2025

img_map_placeholder

1700 N Wheeling St, Aurora, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.