BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Greensboro, North Carolina. Working plans call for the renovation of a 3,973-square-foot, one-story above grade educational facility.

This project includes a +/- 3,793 gross square feet (369 square meters) greenhouse with an integrated headhouse at the north end. The headhouse portion is included in this narrative as it is envisioned to be greenhouse construction with solid, insulated panels in lieu of glazing material. The greenhouse is based on a European Venlo roof design. The greenhouse will include a concrete/masonry knee-wall around its perimeter. The greenhouse is subdivided into separate interior compartments to accommodate researcher and department needs. The compartments include the following sizes and quantities: "Innovation" 418 SF (38.8 square meters), "SFLS" 660 SF (61.3 square meters), "Engineering" 657 SF (61.0 square meters), and "Environmental Studies" 658 SF (61.1 square meters). Compartments are located on a common access corridor along the broad length of the greenhouse, connecting to the headhouse at the north. The greenhouse compartments will be evaporative cooled and fin tube heated with a hot water boiler located in the Headhouse area. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be workretained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days. The owner reserves the right to reject any or all bids and to waive informalities. Question Deadline 08/22/2024 at 2:00 PM ET All questions, requests for clarification, and/or proposed substitutions shall be submitted via email to the architect by online Per owner, all bids were rejected, and this will re-bid at a future time and date TBD.

Final Planning

Educational

$300,000.00

Public - State/Provincial

Renovation

72

27

54

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
68
Bidding Soon
1,543
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

February 6, 2025

img_map_placeholder

1601 E Market St, Greensboro, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.