BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Palo Alto, California. Contact the soliciting agency for additional information.

The City of Palo Alto is seeking a five-year proposal from qualified firms to provide annual, on-call, and day rate maintenance services for Open Space Preserves which include (Baylands Nature Preserve, Foothills Nature Preserve, and Pearson Arastradero Nature Preserve) Locations outside of the Open Space Preserves include but are not limited to Hale Well and Mayfield Reservoir. The required services and performance conditions are described in the Scope of Work (or Services). Summary The specifications or scope of work included have been prepared to describe the standard of quality, performance, and other characteristics needed to meet City requirements. The City will accept alternative proposals of a designated material, product, thing, "or equal", and will determine if such alternative proposals are satisfactory in meeting mandatory requirements or specification, and if the proposed alternative meets the intent of the original mandatory requirement. Contractor shall perform trail maintenance in the Palo Alto Baylands Preserve, the Pearson Arastradero Nature Preserve and in Foothills Nature Preserve. This includes furnishing all labor, equipment, supervision, transportation, tools, operating supplies, and incidentals to perform the work in accordance with the specifications and provisions of the contract. The Palo Alto Baylands trail system is approximately 10 miles of compacted dirt, crushed rock or oyster shells. The Foothills Nature Preserve trail system is 15.0 miles long and includes approximately 40 drainage dips. Pearson-Arastradero Nature Preserve trail system is 10.3 miles long and includes approximately 15 drainage dips and water bars. The work will consist of, but is not limited to (1) grooming existing trails, (2) reshaping existing drainage dips, (3) installing new drainage dips, water bars and culverts, (4) closing "outlaw trails" using earth berms and other methods as described below, and (5) seeding and mulching disturbed areas outside of the travelway, (6) brushing and limbing, (7) construction of replacement wooden foot bridges, and (8) spreading and compacting crushed rock and oyster shell on trail treads. The project manager will make the determination of trail tread material to be used at each site. Background The City of Palo Alto Community Service Department, Open Space, Parks and Golf Division and the City of Palo Alto Utilities Department seeks a request for proposal (RFP) for the repair and service roads within the Palo Alto Baylands, the Pearson-Arastradero Nature Preserve and the adjoining Foothills Nature Preserve. The principal intent of this project is to: Correct for improper slopes to improve access and reduce run-off soil erosion Make the existing trails safer by repairing ruts and removing hazards Make existing year round trails in Pearson-Arastradero Preserve all-weather by improved drainage and aggregate surfaces Establish appropriate drainage so that the trails are easy to maintain by the Park Rangers Eliminate inappropriately situated or renegade trails in the Pearson Arastradero Preserve Make the trails accommodating to visitors by trimming vegetation encroaching the trail corridor consistent with the "Foothills Park Trail Management Plan". Question Submission Deadline: August 7, 2024, 1:00pm. Question Response Deadline: August 12, 2024, 5:00pm. Work Commences (Tentative): October 28, 2024. Performance Time - The performance time for the annual maintenance aspect of this project is estimated to be 60 calendar days per year. Work must be completed each year by December 31st.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
73
Bidding Soon
1,550
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 28, 2024

img_map_placeholder

Multiple Locations, Palo Alto, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.