BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work, paving and new construction of a bridge / tunnel in Nevada, Iowa. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.shawlocal.com/sauk-valley/2025/05/05/iowa-department-of-transportation-announces-bridge-closures-for-two-projects-at-fulton/ DAVENPORT, Iowa – A pavement replacement project on the U.S. 30 bridge over the Mississippi River between Clinton, Iowa and Fulton, will require closing the roadway to traffic starting at 6 a.m. Wednesday, May 7, until 6 p.m. on Friday, May 9, weather permitting, according to the Iowa DOT’s Davenport construction office. When the roadway is closed motorists must follow a marked detour route using U.S. 67, Illinois 84, and Iowa 136 to cross the river. The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts. The Illinois 136 bridge, also known as the North Bridge, over the Mississippi River, will close May 12 for maintenance by the Iowa Department of Transportation. That project, which includes a deck overlay, will force the bridge to be closed to all traffic from May 12 through Sept. 30 with an estimated completion date of Oct. 1. During the project, traffic will be detoured to the Highway 30 bridge, located south of Fulton. “If there’s an incident on Highway 30, traffic may be rerouted to the Savanna/Sabula bridge. Please plan ahead for potential delays and increased traffic,” city of Clinton, Iowa, officials posted online. “The Iowa DOT understands this may be inconvenient and they appreciate your patience as they work to ensure the long-term safety of the bridge.” ------------------------------------------------------------ US 30: Stream 0.8 mi E of Co Rd F58 As of November 13 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. IADOT - Bridge New, Right of Way - US 30 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$1,800,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
104
Bidding Soon
1,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.