BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Del Rio, Tennessee. Conceptual plans call for site work for a water / sewer project.

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (sealed bid) for the purpose of permanently plugging of Penstock #4 to eliminate the need for continued maintenance of penstock and irrigation gates. Most work takes place 190 feet below the Dam's service deck. Contractor must manage the confined space and any water infiltrations. The major construction efforts include, but not limited to, the following tasks: o Remove Irrigation Gate o Design and install a man lift needed to access personnel and materials down to Penstock #4 plug area o Install temporary brackets to the Penstock Gate o Clean, measure, and repair monolith base adjacent to the Penstock Gate o Clean and prepare the surface of the concrete plug, install sheer brackets, formwork, place concrete and grout in the plug area. Upon completion of the plug and repair work, the temporary brackets shall be removed. o Remove the Penstock Gate The following site constraints apply: o The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor, and any subcontractors, shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays. o There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Use of the bulkhead must be coordinated with Amistad Field Office Area Operations Manager through the COR. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). o Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. o Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Field Office Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000. The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work shall be completed within three hundred (300) calendar days after the Notice to Proceed. o One hundred and eighty (180) calendar days are allotted for construction. o The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction. The time for completion of final paperwork is included in the three hundred (300) calendar days. The time stated for completion shall include final cleanup of the premises. The Solicitation, plans, and specifications are expected to be posted on or about August 1, 2024 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days. This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid to be considered by the Agency. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
30
Bidding Soon
632
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.