BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2024 at 8:00 PM

Updated September 13, 2024

Site work and paving for a civil project in Sheldon, Iowa. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of September 11, 2024 bid received was rejected. No definite date for rebid. Work generally consists of removal and replacement of storm sewer culverts for Division I and II, removal and replacement to include, but not limited to: - Grading, Excavation, Subgrade Preparation and Modified Subbase - Storm Sewer culverts - 7" and 8" P.C. Concrete Pavement - Pavement Removals - Water main adjustment - Temporary Traffic Control - Erosion Control Items

Final Planning

Bridges / Tunnels

$710,000.00

Public - City

Paving, Site Work

33

13

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
60
Bidding Soon
508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

March 11, 2025

Project location map

Multiple Locations, Sheldon, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.