Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a warehouse / distribution facility in Maywood, Illinois. Completed plans call for the renovation of a warehouse / distribution facility.
Central Compound Floor Repairs. The work includes, but is not limited to, bottom of slab and concrete beam repairs and epoxy flooring overlay at the Central Compound Garage and slab on grade replacement at the Central Compound HVAC Shop, and other related work as specified in the plans and specifications. During the bid process, all inquiries must be directed in writing and emailed to the District's Purchasing Agent as follows: Email: fpd.purchasing@cookcountyil.gov. All questions must be received in writing by 5:00 p.m. August 16, 2024. 20% MBE participation goal and a 10% WBE participation goal. BID SECURITY A. When required, the Bid shall be accompanied by a Bid Bond in the amount of five percent (5%) or more of the Bid, which shall be used for the Bid Security Deposit. The Bid Security Deposit is to be attached to the Bid Deposit Form, which shall be submitted with the Bid. Compliance with the provisions contained herein will be determined, in all cases, by the District's Purchasing Agent and such determination shall be final. When required, the bid shall be accompanied by a surety statement from a qualified Surety Agency indicating bidder's ability to obtain valid and enforceable Performance Bond and Payment Bond in the full amount of the bid, should the Contract be awarded to the Bidder. The actual bond shall be provided within fourteen (14) days of the notice of award. (Note: Refer to "IB-10. Bid Security - Section C" for Bond Rating and Financial Size Category requirements). TIME OF COMPLETION OF CONTRACT Work shall be substantially completed within 120 calendar days from the date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. RIGHT TO ACCEPT AND REJECT BIDS The District reserves the unqualified right to reject or accept any and all bids or any combination thereof, if applicable, which, in its sole and absolute judgment, will best serve the public interest. In the event equal bids are received, the District reserves the unqualified right in its absolute and sole discretion, to accept the bid, in whole or in part, from the Contractor that the District deems most qualified and/or that will, under all circumstances, best serve the public interest. The District reserves the right to reject any proposals that are incomplete, conditional, and obscure or contain alterations and/or additions to, standard bid specifications issued by the District. Construction Documents are electronically available for download 24 hours a day beginning on August 2, 2024 to August 29, 2024 at the Districts web site, http://fpdcc.com/finance.
Post-Bid
Warehouse / Distribution
$30,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2024
September 30, 2024
2199 S 1st Ave, Maywood, IL
Related To This Project
Maywood, IL
Bid Date: Aug 23 2024
Maywood, IL
Bid Date: Oct 30 2024
Maywood, IL
Bid Date: Nov 15 2024
Maywood, IL
Bid Date: Dec 06 2024
Maywood, IL
Bid Date: Sep 10 2024
Maywood, IL
Bid Date: Jul 22 2024
Maywood, IL
Bid Date: Jul 22 2024
Maywood, IL
Bid Date: Jul 22 2024
Maywood, IL
Bid Date: Jun 14 2024
Maywood, IL
Bid Date: May 17 2024
Maywood, IL
Bid Date: Apr 29 2024
Maywood, IL
Bid Date: Apr 05 2024
Maywood, IL
Bid Date: Mar 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.