Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in New Ellenton, South Carolina. Contact the soliciting agency for additional information.
Description of Requirement 1. INTRODUCTION: Contractor shall furnish all labor, mobilization, personnel, supervision, materials, supplies, tools, equipment, transportation, and incidentals to perform all work identified in the task order. Optional Emergency Fence Repair on Perimeter Fencing, plus Fence Maintenance at least 24,997 SQ. YD. of fencing. a) Regular Fence Maintenance and Clearing (Non-Emergency) i) Contractor's labor rates must include all overhead, mobilization to and from the job site, supervision, tools, incidental supplies, quality control, and profit needed to perform the services for all fencing maintenance activities with the Savannah River Site. Task orders must be agreed upon using the firm fixed price rates reflected in the schedule of items, cost of materials, and delivery schedule. ii) Work may be performed anywhere on the Savannah River Site at the direction of the COR as needed mainly on the SRS boundary fence. The areas will require work in remote areas. Following the SRS remote worker policy is required, see SRS Special Solicitation Number: 12444124Q0100 requirements document for details. iii) Maintenance and clearing work include but are not limited to the following: Repairing breaks in fencing including the repair of 3-strand barbed wire fence, repair of woven wire fence with minor mending of wire, salvaging material in the existing fence and reincorporate the material into the fence. Clearing 3 FT on each side of fence line conforming to the specifications. This includes removal of all vegetative debris including but not limited to branches, bushes, shrubs, trees, etc. that are within 3 FT on either side of the fence line. Cleared vegetative debris may be field scattered at the discretion of the COR. Any metal debris may be disposed of at a designated collection point provided by the government on SRS property. Replacement of damaged fence posts including setting replacement posts in concrete and disposal of damaged posts. Repair/Replace Corner, End, Intersection, intermediate line braces, and Gate Brace Panel sections as required including disposal of damaged sections. Furnishing and Installation of brace panel with 9-gage twisted tension brace wires and/or 4-in dia. diagonal brace posts. iv) This contract includes the following quantities: - Approximately 7.1 miles of fence line clearing which includes clearing 3ft on either side of fence line. This equates to approximately 24,997 SQ. YD. of total fence line area to clear. - Up to 200 L.F. of barbed wire replacement/installation including steel posts with hardware. - Up to 200 L.F of Barbed wire mending/repair work - Up to 40 hours of Gate repair work (Replacement gates and gate hardware will be furnished by the government) - Up to 33 Each of Corner, End, Intersection, Intermediate line brace, and Gate Brace panel replacements. This includes furnishing brace panels, installing brace panels, setting 4" posts in concrete, installation of 4" diameter diagonal brace posts with 9-gauge twisted tension brace wire as required. b) Emergency Repair Fence Maintenance (Response within 72 hours) i) Repair of, 3-strand barbed wire fence and woven wire fence, with Minor Mending of Wire. Salvage material in the existing fence and incorporate the material into the reset fence. Replace fence material damaged beyond reuse. Replace line posts with steel posts when wood post is damaged. Solicitation Number: 12444124Q0100 ii) Repair of gates. Salvage material in the existing gate and incorporate the material into the reset gate. Replace Gate damaged beyond reuse with Government Supplied gate. Replace hinge/line post(s) structure when post is damaged. iii) Emergency repair work must begin within 72 hours of notification. Response time includes holidays and weekends. 2) PERSONNEL QUALIFICATIONS: None, except for the contractor's requirements 3) GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND MATERIALS: a) Site Motorola Radio and pager b) Property pass/prohibited & controlled articles pass c) Remote Worker Map d) Gate and materials for hanging new gate that are beyond repair 4) REGULATIONS/POLICIES: a) Contractor will use specifications set forth in the Standard Fence Detail Drawing for repairs and maintenance as well as adhere to Clearing specifications as described in Section 202 of the FP-14 manual. b) The contractor will complete work under each task order in accordance with the task order and the specifications contained or referenced herein. c) All contractors will be required to get a SRS badge before approved access to the Savannah River Site. 8 hour GET or CAT training are required prior to badge being picked up at the SRS badge office and will be considered incidental to the contracts schedule of items. See the SRS Special requirements and badge request process attachment for more information. d) The contractor's movement on the existing transportation system of the SRS is restricted due to limited security access points onto and within SRS. These access points have various times of operation and protocols to be followed in order to gain access on to the site. The contractor must establish and implement methods of ensuring that all badges issued by the government are kept secure in the contractor's possession and are not used by unauthorized persons. e) Security badges must be worn at all times on the Savannah River Site, and proper PPE must be used. f) Before the work commences the contractor must present a safety plan that the address the hazards associated with the requirements of the project per OSHA standards, and will need to be viewed by the USDA Forest Service, Savannah River's Safety Manager prior to starting work. 5) The Contractor shall if required, provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices as described in section 635 in the FP-14 as required. Contractor shall take all necessary Solicitation Number: 12444124Q0100 precautions for the protection of the work and safety of the public at the Savannah River Site. SRS roads or fence boundary areas closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. 6) TRAINING: a) The Contractor is responsible for all training for its employees. 4) Address questions about this solicitation to Christopher Malley at christopher.malley@usda.gov Delivery Date: 120 Days from date of award Delivery Location: USDA Forest Service Savannah River Forest Station P.O. Box 700 New Ellenton, SC 29809-0700
Post-Bid
Water / Sewer
Public - Federal
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2024
October 16, 2024
To Be Determined, New Ellenton, SC
Related To This Project
New Ellenton, SC
Bid Date: Nov 26 2024
New Ellenton, SC
Bid Date: Jul 30 2024
New Ellenton, SC
Bid Date: Feb 02 2024
New Ellenton, SC
Bid Date: Dec 19 2023
New Ellenton, SC
Bid Date: Aug 23 2023
New Ellenton, SC
Bid Date: Mar 31 2023
New Ellenton, SC
Bid Date: May 25 2023
New Ellenton, SC
Bid Date: Jun 26 2023
New Ellenton, SC
Bid Date: Jul 28 2022
New Ellenton, SC
Bid Date: Apr 05 2022
Myrtle Beach, SC
Bid Date: Aug 28 2024
Sumter, SC
Bid Date: Aug 27 2024
Clemson, SC
Bid Date: Aug 22 2024
Sumter, SC
Bid Date: Aug 27 2024
Saluda, SC
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.