Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2024 at 8:00 PM
Updated August 27, 2024
Site work, paving and renovation of a mixed-use development in Ivins, Utah. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Snow Canyon Paving & Entrance Station Construction Cost Estimate: $1,400,000.00. Project Description: Project includes removal of existing entrance station and placing new entrance station building and parking improvements at various locations throughout Snow Canyon State Park. Mobilization/Demobilization. Field Surveying and Staking. Traffic Control. 3" Thick Asphalt Pavement over 8" Thick Untreated Base Course. Gravel Parking Lots. Curb & Gutter. Concrete Curb (Entrance Station). Mountable Curb and Gutter. Concrete Parking Blocks. Pavement Striping. Bollards. Signage. Silt Tortoise Fence. Drainage Ditch. Pressure Treated Wood Stairs. Earthwork, GeoCell Fabric, Topsoil, and Reseeding. Earthwork and Reseeding. Riprap Stabilization with Geotextile Fabric. Entrance Station - Raise. Water Valve Can. Rail Wood Signature Fence. Entrance Station. Retaining Block Wall. Speed Hump. 18" CMP Culvert Installed. 18" CMP End Sections. Concrete Pipe Collar. Raise Manhole Cover. Entrance Station Riprap Stabilization with Geotextile Fabric. Excavate Soft Spots and Re-compact with Import Fill. Welded Steel Fence. Remove Catch Basin. Concrete Island. Existing Entrance Station Demolition. PID- 24107
Bid Results
Sidewalks / Parking Lot
$1,993,594.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
October 21, 2024
1002 Snow Canyon Dr, Ivins, UT
Related To This Project
Ivins, UT
Bid Date: Oct 09 2024
Ivins, UT
Bid Date: Nov 06 2024
Ivins, UT
Bid Date: Dec 17 2024
Ivins, UT
--
Ivins, UT
--
Ivins, UT
Bid Date: Oct 30 2025
Ivins, UT
Bid Date: Sep 15 2025
Ivins, UT
Bid Date: Oct 28 2025
Ivins, UT
Bid Date: Aug 22 2024
Ivins, UT
Bid Date: Nov 28 2023
Ivins, UT
Bid Date: Oct 31 2023
Ivins, UT
Bid Date: Mar 23 2022
Ivins, UT
Bid Date: Jul 26 2023
Ivins, UT
Bid Date: Jul 28 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
