BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Troy, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Pike County Contract Time: 100 Working Days DBE Goal Percent: 2.00 for constructing the Roadway Improvements/Access Management (Widening, Planing, Resurfacing, Traffic Signs, and Traffic Stripe) on SR-10 (US-231) from the junction of SR-87 in Troy to the junction of Industrial Park Boulevard southeast of Troy. Length 1.931 mi. The Bracket Estimate on this project is from $1,656,316 to $2,024,387. If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call 021 - Roadway Improvements/Access Management (Widening, Planing, Resurfacing, Traffic Signs, and Traffic Stripe) on SR-10 (US-231) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description. (b) Bituminous Treatment Table. Article 401.01(b) shall be replaced with the following: (b) Bituminous Treatment Table. The following table shows the amount of bituminous material and the size and amount of cover aggregate required for the various types of bituminous treatments. The types are designated in the table by letters of the alphabet such as A, B, C, D, etc. The proposal will designate in the pay item description which of the various types are to be used. The kind of bitumen may also be specified or, if none is specified, the Contractor may select one of the kinds, if not in conflict with other provisions of these Specifications, permitted by the table. All other requirements of the tabular line opposite the type designation shall apply. (Example: A bituminous treatment Type AKG, specifies a prime coat with the quantities specified on line "A", covered by a single surface treatment with the quantities specified on line "K", covered in turn by a seal treatment with the quantities shown on line "G".) Bituminous materials shall be placed within the tolerance specified by the table for the type treatment involved, unless otherwise ordered by the Engineer in writing. Any variation outside of the designated limits shall be cause for ordering the treatment to be removed and replaced or corrected as directed by the Engineer, all without additional cost to the Department. The rate of aggregate coverage shown by the table is the approximate rate found to produce an acceptable coverage when properly applied. Regardless of the rate shown, the Contractor shall provide aggregate in sufficient quantities and so spread the aggregate that the bitumen is uniformly and evenly covered. The Engineer will notify the Contractor in writing should it become advisable to change the amounts of any material from the limits specified in the table. In such event an adjustment in the contract unit price will be made as specified in Subarticle 401.06(a). MBE (29.9%), WBE (6.9%), DBE (2%)

Bid Results

Roads / Highways

$2,689,318.00

Public - State/Provincial

Paving, Site Work

133

5

5

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
21
Bidding Soon
333
All Active Projects
130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

October 29, 2024

img_map_placeholder

AL-10, Troy, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.