BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2024 at 8:00 PM

Updated August 17, 2024

Demolition, site work, new construction and addition to a fitness / recreation center in Squamish, British Columbia. Completed plans call for the addition of a fitness / recreation center; for the demolition of a fitness / recreation center; for the construction of a fitness / recreation center; and for site work for a fitness / recreation center.

Question Deadline 08/09/2024 at 2:00 PM PT A Summary Details Kinetic Construction Ltd. the Contractor, is a party to the Integrated Project Delivery (IPD) Contract, invites your company to submit a tender for this project. Brennan Park Rec IPD TP # 2.2 Customer Service Expansion / TP #4 Maintenance Building Kinetic Construction Ltd (KCL), the Contractor, is a party to the Integrated Project Delivery (IPD) Contract for constructing Brenan Park Recreation Centre for The District of Squamish. IPD focuses on a highly collaborative open approach to drive team success. The expectation of the successful bidders will be to share in these common goals. Subcontractors are required to price separately for each Tender Package TP #2.2 & TP #4. 1.2 Construction is expected to start in August 2024 and is expected to have substantial completion in May 2025 TP # 2.2. Customer Service Expansion = Area = 3563 SQFT includes: Architectural Cabinetwork Bituminous Damp Proofing and Troweled Membrane Building Insulation & Vapor Barrier TPO Membrane Roofing Sheet Metal Wall Cladding Doors & Hardware Interior Glazing Assemblies Steel Stud Framing Finishes Including Painting & Flooring Earthwork & Utility Services Landscape & Exterior Improvements TP # 4. Maintenance Building Area = 1550 SQFT includes: Concrete Reinforcing, Formwork, PP & F Concrete Masonry Units Wood Framing Finish carpentry & Architectural Cabinetwork Bituminous Damp proofing and Troweled Membrane Sheet Metal Roofing Sheet Metal Wall Cladding Roof Accessories Snow Guards Doors & Hardware Insulated Rolling Door Misc. Specialties Signage Earthwork Exterior Improvements Utility Services 1.3 TP # 2.2 Construction is expected to start on 21st August 2024 and is expected to have substantial completion on 25th May 2025. TP # 4 construction is expected to start on 3rd September 2024 and is expected to have substantial completion on 28 February 2025. Documents can be obtained at https://kineticconstruction.app.box.com/s/uukd33utcgq7p2auue5pd3zrxu000z47

Post-Bid

Fitness / Rec Centers

$2,000,000.00

Public - County

Addition, Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

August 21, 2024

Project location map

1009 Centennial Way, Squamish, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.