BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Elmhurst, Illinois. Contact the soliciting agency for additional information.

This project requires 24 % DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 31, at 1:00 PM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for the I-290 frontage road (Harrison Street) drainage improvement from 22nd Avenue to Des Plaines River. As part of this frontage road storm sewer (FRS) improvement, a 66-inch and 72-inch reinforced concrete relief sewer and associated lateral sewer connections, manholes and catch basins will be constructed using open cut method along the south side of the Harrison Street. The FRS will be built to allow the local separated storm sewer to connect into it, helping alleviate local flooding. The FRS will outlet into the Des Plaines River. As part of this improvement, 24-inch diameter storm sewer stubs along the frontage road storm sewer will be constructed and bulkheaded at every cross street where local sewer separation has not been completed. In addition, FRS along Harrison Street will be constructed in a way that allows for future connection to the proposed FRS along Bataan Drive with a crossing at east of 1st Avenue. The completion date for this contract will be 12 months after authorization to proceed. The Prime firm must be prequalified in the Highways (Freeways) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 2 - RFQ - FAI 290 (Eisenhower Expressway) Drainage Improvements

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
89
Bidding Soon
1,785
All Active Projects
773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.