Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Union Springs, New York. Completed plans call for site work for a bridge / tunnel.
Repair of two culverts located under Homer and Grove Streets and improvements to the headwalls at each culvert. Removal of trees and brush, installation of gabion baskets and steel guard rails. In accordance with Section 103 of Article 5-A of the General Municipal Law, sealed Bids for the repair and improvement of two culverts located on Homer Street and Grove Street are requested from qualified contractors. Project work includes the following items: A. Supply and install a number of cut stone replacement blocks within the barrel of each culvert. B. Repairtheheadwallsofeachculvertbyaddingcutstonesandgabionbasketsfilledwith stone blocks to stabilize the headwalls. C. Cut down and remove a number of trees and brushnear each culvert. D. Demolish and remove existing chain link fencing along one culvert. E. Provide and install new guard rails near one of the culverts. F. Contractor to supply all materials and labor for the project. G. Work must be completed at New York State Prevailing Wage Rates as published by the New York State Department of Labor, and certified pay role documents proving that prevailing wages were paid must be provided for all work. The Village reserves the right to reject any or all bids, or to waive any informalities, or to make an award to other than the low bidder. It further reserves the right to limit the amount of the award. The Village does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. No sales tax is to be charged for materials or labor for the project. The winning bidder will be supplied with a tax exempt certificate for the project. 1. Project Location: On Grove and Homer Streets in the Village of Union Springs. 2. Existing culverts: are hand laid stone arch culverts about 5' tall and 4' wide with roadways above. Several stones have fallen out of each culvert and been washed away during flooding. 3. Project work required: a. Make repairs to each culvert within the barrel by cutting new stones to the needed dimensions and inserting them into the holes where stones have fallen out over the years. b. Fill the spaces behind missing stones and around new stones with grout. c. Make similar repairs to missing stones in the headwall outside of the barrel of each culvert. d. Add gabion baskets at headwalls to direct water flow into culverts more efficiently. Adding the gabions will require clearing of a number of large trees and brush. Estimated contract value is $100,000 - $150,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$205,778.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
September 23, 2024
Homer St & Grove St, Union Springs, NY
Related To This Project
Union Springs, NY
Bid Date: Dec 17 2024
Union Springs, NY
Bid Date: Jun 18 2024
Union Springs, NY
Bid Date: Jan 16 2024
Union Springs, NY
Bid Date: Nov 28 2023
Union Springs, NY
Bid Date: Jun 21 2022
Cayuga Lake Blueway Trail Implementation Phase 2 Frontenac Park ADA-Compliant Kayak Launch - 5057132
Union Springs, NY
Bid Date: May 26 2023
Union Springs, NY
Bid Date: May 05 2023
Union Springs, NY
Bid Date: Sep 12 2019
New York, NY
--
New York, NY
--
Elmira, NY
Bid Date: Aug 29 2024
Buffalo, NY
Bid Date: Aug 22 2024
Geneva, NY
--
Manlius, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.