BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2024 at 8:00 PM

Updated September 7, 2024

Site work for a water / sewer project in Winter Garden, Florida. Completed plans call for site work for a water / sewer project.

Skid-Mounted Centrifuge Dewatering System for Water Resource Recovery Facility. Start/Delivery Date ~December 1, 2024 Project Duration 3 years, plus up to three optional, one-year renewals Question Deadline 08/27/2024 at 6:00 PM ET Online Q&A Yes Florida Statute 287.05701- Pursuant to Florida Law, the District may not request documentation of or consider a vendor's social, political, or ideological interests when determining if the vendor is a responsible vendor, or give preference to a vendor based on the vendor's social, political, or ideological interests. Although the waste activated sludge (WAS) pumping, thickening, and storage facilities are in fair to good condition, the belt filter presses associated with the dewatering process have approached the end of their useful life and are no longer in service. The Central Florida Tourism Oversight District (District) owns a 20 million gallon per day (MGD) annual average daily flow (AADF) Water Resource Recovery Facility (WRRF) which is operated by Reedy Creek Energy Services (RCES). The existing WRRF biosolids handling facilities consist of sludge thickening, storage, dewatering and conveyance systems. The WRRF currently produces about 35,000 gallons of TWAS daily, and this production fluctuates depending on the treatment process requirements. Additionally, future development is anticipated for the WRRF's service area, and the TWAS production may increase relative to this anticipated growth. Given that the onsite storage is limited, the skid-mounted centrifuge dewatering system and operations must be capable of processing the current and future daily TWAS production and produce dewatered solids with a minimum solids concentration of 16.5% to meet the WRRF's disposal requirements. The scope shall include the skid-mounted centrifuge dewatering system and a dewatering equipment operator. The skid-mounted centrifuge system shall consist of all the necessary components and include but not limited to the following: connection hoses, electrical cable, polymer mixing and pumping system, polymer day tank, centrifuge dewatering unit, screw auger conveyor system that conveys dewatered cake to trailers, means to swap trailers, and centrate pump. The District shall provide feed solids, reclaimed water, electricity, polymer, trailers, centrate auto sampler, and centrate discharge point. The project also requires monthly management and maintenance of the unit. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00%

Bid Results

Water / Sewer

$2,559,433.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
157
Bidding Soon
2,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

Project location map

2151 S Service Ln, Winter Garden, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.