BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2024 at 8:00 PM

Updated August 17, 2024

Demolition, site work, paving and new construction of a civil project in Alma, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

City/County - Marion Description: Proposed improvements include removal of existing two span bridge; construction of a proposed single span bridge with a precast prestressed concrete deck beam superstructure on steel pile supported spill-thru concrete abutments; reconstruction of the roadway; and all miscellaneous work necessary to complete the proposed improvements. 1. Tree Removal, Acres - 0.5 Acre 2. Earth Excavation - 210 Cu Yd 3. Channel Excavation - 260 Cu Yd 4. Furnished Excavation - 790 CU Yd 5. Aggregate Surface Course, Type B - 457 Ton 6. Removal of Existing Structures - 1 Each 7. Pipe Culvert Removal - 20 Foot 8. Concrete Structures - 30.4 Cu Yd 9. Concrete Encasement - 2.8 Cu Yd 10. Precast Prestressed Concrete Deck Beams (33" Depth) - 1680 Sq Ft 11. Reinforcement Bars - 4830 Pound 12. Furnishing Steel Piles HP12x53 - 679 Foot 13. Driving Piles - 679 Foot 14. Test Pile Steel HP12x53 - 1 Each 15. Pile Shoes - 8 Each 16. Name Plates - 1 Each 17. Pipe Culverts, Class D, Type 1 15" - 30 Foot 18. Mobilization - 1 L Sum 19. Terminal Marker-Direct Applied - 4 Each 20. Porous Granular Embankment (Special) - 108 Ton 21. Steel Railing, Type SM (Special) - 144 Foot 22. Seeding, Class 2 (Special) - 0.5 Acre 23. Stone Dumped Riprap, Class A4 (Special) - 367 Ton 24. Traffic Control and Protection, (Special) - 1 L Sum Project Location: TR 213 (Range Rd) near the NW 1/4, NE 1/4, Section 7, T2N, R1E, 3rd PM Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. ILDOT - Removal of Existing Two Span Bridge; Construction of a Proposed Single Span Bridge

Post-Bid

Bridges / Tunnels

$700,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
71
Bidding Soon
1,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

September 16, 2024

Project location map

Range Rd, Alma, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.