BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work, paving and outdoor lighting for a civil project in Perry Township, Indiana. Design plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

As of July 24, 2025, an engineer has been selected, and this project is in the early design phase. It is anticipated bidding will commence early October 2030. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Title: Allen County PE and RW Services for the Corbin Road and Union Chapel Road (Des # 2400742) in the Fort Wayne District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perfonn any services but only serves notice the firm desires to be considered. Local Public Agency: Board of Commissioners of the County of Allen, Indiana Project Location: Corbin Road and Union Chapel Road Intersection Project Description: Allen County is seeking a consultant to provide design and RW services for Construction of a single-lane roundabout to replace the existing three-way stop controlled intersection of Corbin Road and Union Chapel Road; reconstruction/rehabilitation of all approaches to the three intersections, to include new pavement sections, milling, widening, overlay and wedge and level as needed; new ornamental streetlights, pavement markings and traffic control signs; all to be in accordance with current design standards. Roadway Improvements will consist of two 12-foot travel lanes (one lane in each direction) extending approximately 500 feet north, south, and east of the existing Corbin Road and Union Chapel Roads intersection INDOT Des #: 2400742 Phases Included: PE and RW Estimated Construction Amount: $3,125,000 Funding: 80/20 Term of Contract: until project completion DBE goal: 7% Contact for Questions: Bill Hartman, Highway Department Director 200 E. Berry Street, Suite #280 Fort Wayne, Indiana 46802 (260) 449-7369 bill.hartman@co.allen.in.us The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Allen County PE and RW Services for the Corbin Road and Union Chapel Road

Design

Roads / Highways

$3,125,000.00

Public - County

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
0
Bidding Soon
677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2030

Project location map

Corbin Rd & Union Chapel Rd, Perry Township, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.