Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 5, 2024 at 8:00 PM
Updated August 6, 2024
This is a service / maintenance or supply contract in Lyndon, Illinois. Contact the soliciting agency for additional information.
This project may contain Federal Funds. This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 7, 2024, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for construction contract 64N01, cold milling, pavement patching, and HMA resurfacing on I-88 from Elkhorn Creek to US 30, 0.4 mile west of the Lee County line. This contract also includes expansion joint replacement, deck patching, concrete overlay, and miscellaneous bridge repairs on six (6) structures, along with demolition and removal of two (2) structures The anticipated Letting for contract 64N01 is January 17, 2025. The anticipated construction completion date is December 31, 2026. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than three (3) months after the construction completion date. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 28 - RFQ - I-88 from Elkhorn Creek to US 30, Phase III Project, Whiteside County, Region Two/District Two
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
I-88, Lyndon, IL
Related To This Project
Lyndon, IL
Bid Date: Nov 08 2024
Lyndon, IL
--
Lyndon, IL
--
Lyndon, IL
Bid Date: Mar 07 2025
Lyndon, IL
--
Lyndon, IL
Bid Date: Jun 13 2025
Lyndon, IL
Bid Date: Apr 25 2025
Lyndon, IL
Bid Date: Mar 08 2019
Lyndon, IL
Bid Date: Aug 02 2024
Lyndon, IL
Bid Date: Mar 08 2024
Lyndon, IL
Bid Date: Jan 30 2024
Lyndon, IL
Bid Date: Jan 19 2024
Lyndon, IL
Bid Date: Nov 17 2023
Lyndon, IL
Bid Date: Jun 05 2023
Lyndon, IL
Bid Date: Jun 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
