Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Lyndon, Illinois. Contact the soliciting agency for additional information.
This project may contain Federal Funds. This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 7, 2024, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for construction contract 64N01, cold milling, pavement patching, and HMA resurfacing on I-88 from Elkhorn Creek to US 30, 0.4 mile west of the Lee County line. This contract also includes expansion joint replacement, deck patching, concrete overlay, and miscellaneous bridge repairs on six (6) structures, along with demolition and removal of two (2) structures The anticipated Letting for contract 64N01 is January 17, 2025. The anticipated construction completion date is December 31, 2026. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than three (3) months after the construction completion date. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 28 - RFQ - I-88 from Elkhorn Creek to US 30, Phase III Project, Whiteside County, Region Two/District Two
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
I-88, Lyndon, IL
Related To This Project
Lyndon, IL
Bid Date: Nov 08 2024
Lyndon, IL
Bid Date: Aug 02 2024
Lyndon, IL
Bid Date: Mar 08 2024
Lyndon, IL
Bid Date: Jan 30 2024
Lyndon, IL
Bid Date: Jan 19 2024
Lyndon, IL
Bid Date: Nov 17 2023
Lyndon, IL
Bid Date: Jun 05 2023
Lyndon, IL
Bid Date: Jun 05 2023
Lyndon, IL
Bid Date: Jun 16 2023
Lyndon, IL
Bid Date: Mar 10 2023
Urbana, IL
Bid Date: Sep 03 2024
Chicago, IL
--
Edinburg, IL
Bid Date: Aug 16 2024
Naperville, IL
Bid Date: Aug 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.