BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a sidewalk / parking lot in Monument, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work consists of furnishing all labor, equipment and materials necessary for the installation of; Hot Mix Asphalt (HMA) overlay, milling, patching, Geotextile (paving fabric if specified), valve box / manhole adjustments, valve box / manhole rebuild, traffic management and pavement markings on various collector and residential streets throughout the Town of Monument (Town). Reference Number: 0000359522 Shape & Pave Parking Lot (5") 2" Full Depth Mill & Overlay Prior to Starting Work, the Successful Bidder Will Be Required to Obtain a 100% Performance Bond. Question Deadline 08/13/2024 at 10:00 AM MT Questions are submitted online: Yes . General Requirements - Insurance Required - Material Safety Data Sheets Required Contractor shall commence performance within ten (10) days after receipt of written notice to proceed, which is expected to be given on or before Date of Notice, and shall diligently perform all work through completion. Unless an extension of time is granted by Owner as hereinafter set forth, Contractor shall complete the Project no later than November 22, 2024.

Bid Results

Sidewalks / Parking Lot

$247,125.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
78
Bidding Soon
1,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

September 16, 2024

Project location map

Multiple Locations, Monument, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.