BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Moses Lake, Washington. Completed plans call for site work for a road / highway.

City: Moses Lake County: Grant State/Province: WA Site Directions: West of Warden WA. Starting at the intersection of State Highway 17 N and State Highway 262 W, head west on Highway 262 We for approximately 6.5 miles. Turn left on K.2 Rd SE and head west for 700 feet to the staging area for the project. The Construction site will be in the canal south of Highway 262 W at the outlet structure of the reservoir. Project Category Code: Concrete/Shotcrete/Sprayed Description: The construction project consists of pneumatically placed, fiber reinforced shotcrete at the outlet of the Potholes Reservoir into the Potholes East Canal. Shotcrete shall be placed above the concrete structure to secure and stabilize the existing rock slopes. All work shall be within the existing USBR rights-of-way and designated work zone. The Contractor cannot begin construction until the end of the regular irrigation season, typically the end of October. Owner Details Owner Name: South Columbia Basin Irrigation District Address: 1135 E Hillsboro, Suite A, Pasco, WA - 99301 Phone: 509-547-1735 Contact: Brian Scott, PE Email: bscott@scbid.org Solicitor Details Solicitor Name: South Columbia Basin Irrigation District Design Discipline: Soliciting agent Address: 1135 E Hillsboro, Suite A, Pasco, WA - 99301 Phone: 509-547-1735 Contact: Brian Scott, PE Email: bscott@scbid.org

Award

Roads / Highways

$176,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
134
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

September 12, 2024

img_map_placeholder

O'Sullivan Dam Rd & K.2 Rd SE, Moses Lake, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.