BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Hiram, Georgia. Completed plans call for the renovation of a municipal facility.

The work will consist of the renovation of the interior of first and second floors and the exterior of the building and the repair and extension of the second floor rear exterior deck. 1. Move the wall between ST office & bathroom #1 inward 1 foot and move the closet wall outward 2 feet and install 'sound reducing' materials in each wall 2. Remove counter tops & cabinets from all bathrooms a. Modify bathroom #1 to be ADA accessible. Add grab bars, widen doors, to allow min. 30" access space, move toilet to allow 60" approach 3. Replace all toilets to ADA compliant 4. Replace sinks & fixtures in both breakrooms and garbage disposal to each 5. Install attic access hatch with pull down stair in 2nd floor large room #1 6. Remove partial wall(s) in lobby area 7. Install reception counters in ET office & DB office, extending from lobby wall into offices with three-quarter wall with a 'secure opening' and secured doors on the end with under counter shelves and cash box drawer 8. Repair & paint all walls, doors, etc. (including conduits) 9. Remove all flooring a. Install carpet tiles on 1st floor b. *Clean & repair 2nd floor carpet c. Install LVT in lobby, bathrooms & breakrooms d. Clean stairs from 1st to 2nd floor e. Clean, paint, repair existing handrail f. Install handrail on entire opposite stairway wall g. Remove door at top of stairs and install in the middle of first landing o Install 'triangle' to fill in open space h. Remove heat/AC unit and make a storage closet 10. Make front door ADA accessible / Automatic o Glue/secure loose tiles at front door 11. Stop water infiltration at front door 12. Add emergency lights, exit signs & 4 rear exit doors 13. Inspect, repair, replace wood on rear deck EXTERNAL 1. Remove hanging fixtures and install security lighting (4 corners) 2. Repair columns / wrap with flute wrap 3. Pressure wash exterior 4. Replace shutters, paint door framing and install a door awning 5. Install 'small' retention wall(s) to prevent water flow towards front door

Award

Municipal

$189,982.00

Public - City

Renovation

4

3

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
50
Bidding Soon
1,431
All Active Projects
543
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

October 7, 2024

img_map_placeholder

150 Oak St, Hiram, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.