Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for a municipal facility in Mobile, Alabama. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. The Work shall commence with permitting through Build-Mobile within three (3) business days of the date of a written Notice to Proceed. The Contractor shall deliver All Work, proof of Advertisement, Close-out documents and Invoices for completed Work within thirty (30) calendar days from the date of the written Notice to Proceed. Contractor shall contact the Municipal Enforcement Deputy Director for any unforeseen delays immediately. Failure to do so will result in Letter of Termination of Work and Liquidated Damages beginning at day forty-five (45) from the Notice to Proceed. A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against the Contractor for the entire period that any part of the Work remains uncompleted for more than fifteen (15) calendar days after the time specified for the Substantial Completion of the Work, the amount of which shall be deducted by the Owner, and shall be retained by the Owner out of monies otherwise due the Contractor in the final payment, not as a penalty, but as liquidated damages sustained. Contact the Deputy Director, Gary Jackson, at the City of Mobile, Municipal Enforcement Department, 251.208.1540 phone or e-mail qary.iackson@citYofmobile.org for further clarification regarding this Request for Quotes.
Post-Bid
Municipal
$50,000.00
Public - City
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2024
September 6, 2024
1002 Alba St, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Aug 27 2024
Mobile, AL
Bid Date: Aug 20 2024
Mobile, AL
Bid Date: Aug 29 2024
Mobile, AL
--
Mobile, AL
Bid Date: Aug 13 2024
Mobile, AL
Bid Date: Aug 22 2024
Mobile, AL
Bid Date: Aug 15 2024
Mobile, AL
Bid Date: Sep 11 2024
Mobile, AL
--
Mobile, AL
Bid Date: Aug 14 2024
Mobile, AL
Bid Date: Aug 15 2024
Mobile, AL
Bid Date: Aug 30 2024
Mobile, AL
Bid Date: Aug 21 2024
Mobile, AL
Bid Date: Sep 04 2024
Mobile, AL
Bid Date: Aug 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.