BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and addition to an educational facility in San Antonio, Texas. Completed plans call for the addition of a 85,000-square-foot, five-story above grade educational facility.

The full scope of the project will be a new 5-story research building split over three bid packages. Package 1 (Elevators) and Package 2 (Gas Relocate, Sitework, Asphalt, Utilities, Erosion Control) were previously bid. Information regarding the third bid package is included below. ___________________________________________________________________________ Bartlett Cocke is requesting BIDS FOR AWARDING THE PROJECT SCOPES for the 100% CD Documents for the New Science 1 Building & Vivarium Expansion that will tie into the existing Barshop Building. • DOCUMENTS: Please note that documents are available through Bartlett Cocke General Contractors. Please reference the Proposal Information Packet for planrooms and other entities that we distributed the documents to. • BID FORM: Please reference the bid form with breakouts, alternates, and other information required to be submitted by the deadline. There are several alternates related to the project. • BEST VALUE AWARD: Please note that project scope award is based on "Best Value" for the owner and the project. If you have any questions about scope that is needed to be included in your proposal, please reference the Proposal Information Packet, Bid Form, and/or contract Alicia Delaney and/or Chris Johnson for further information. • WAGE RATES: Prevailing Wage Rates and certified payroll will apply to the project. • INSURANCES: This is a Owner's Controlled Insurance Project (OCIP). • SCHEDULE: Please reference the schedule in the Proposal Information Packet that is issued with the design team's documents. Please note that no contract can be awarded prior to owner approval to move forward with the project. This is anticipated for late September. • HUB PARTICIPATION: Historically Underutilized Businesses (HUBs) are encouraged to propose on the project. There is a project percentage goal for the project. Bartlett Cocke is an equal opportunity employer. • QUESTIONS: Please submit questions and substitution requests in writing to adelaney@bartlettcocke.com and/or cjohnson@bartlettcocke.com. Please do NOT contact the owner or the design team directly with questions. • BUDGET: Anticipated budget for the total project is approximately $75,00,000. • PRE-BID: A pre-bid will be held on August 16, 2024, at 11:00 AM at the Bartlett Cocke Main office located at 8706 Lockway, San Antonio, Texas 78217 in the Main Board Room. • PREVIOUS BID PACKAGES: Bid Package 01 (Elevators) and Bid Package 02 (Gas Relocate, Sitework, Asphalt, Utilities, Erosion Control) were previously bid. We cannot accept additional proposals for these scopes of work. Pre-bid requests for information are due August 23, 2024 at 12:00pm, central time. Please let Alicia Delaney adelaney@bartlettcocke.com or I know if you have any questions.

Post-Bid

Educational

$79,000,000.00

Public - State/Provincial

Addition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
131
Bidding Soon
3,216
All Active Projects
1,245
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 5, 2024

October 2, 2024

March 16, 2027

img_map_placeholder

8300 Floyd Curl Dr, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.