Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2024 at 8:00 PM
Updated November 1, 2024
Site work for a sidewalk / parking lot in Pincher Creek, Alberta. Completed plans call for site work for a sidewalk / parking lot.
Pincher Creek's Concrete Repairs may include removal and replacement of existing sidewalks, installation of new sidewalks, removal and replacement of existing curb & gutters, installation of new curb & gutter, resurfacing existing concrete, and finishing work to previously completed sidewalks such as sod and/or surface repair. Work for each site is to include all requirements including (but not limited to) labour, fabrication, equipment and materials necessary to complete the Work. This Work will include, but will not be limited to: - Traffic accommodation - Removal and disposal of existing concrete, gravel, asphalt, landscaping and other materials - Re-grading as necessary to ensure proper drainage, cross slope etc. - Subgrade preparation - Base gravel installation and compaction - Concrete construction - Surface remediation of landscaping, asphalt or other - Maintenance Warranty repair Site(s) of the Work Site 1 - 686 Lacombe St Site 2 - 1141 James Av Site 3 - 916 Main St Site 4 - 1133 & 1131 Briar Rd Site 5 - Main St (between Geddes Av and Hill Av on the south side of Main St near the retaining wall) - Provisional Site 6 - Rimmington Av (north of Charolette Street on the west side of Rimmington) - Provisional Documents can be obtained from https://pinchercreek.bidsandtenders.ca/
Award
Sidewalks / Parking Lot
$62,245.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2024
September 1, 2024
Multiple Locations, Pincher Creek, AB
Related To This Project
Pincher Creek, AB
Bid Date: Sep 30 2024
Pincher Creek, AB
Bid Date: Nov 20 2024
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Nov 19 2024
Pincher Creek, AB
Bid Date: Feb 24 2025
Pincher Creek, AB
Bid Date: Mar 06 2025
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Apr 23 2025
Pincher Creek, AB
Bid Date: Aug 02 2024
Pincher Creek, AB
Bid Date: Sep 10 2020
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Jul 25 2024
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Sep 24 2020
Pincher Creek, AB
Bid Date: Oct 14 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
