BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work and paving for a bridge / tunnel in Winnipeg, Manitoba. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Rehabilitation of Louise Bridge. The City would like to determine if it is technically and economically feasible to do any of the following as part of bridge rehabilitation work: (a) Remove the posted weight restriction for the bridge by improving the load carrying capacity. (b) Improve the vertical clearance at the portal frames; (c) Improve the sidewalk width. TIMELINE: Tender was issued and closed December 5, 2025; submissions are under review. Final award may be confirmed early 2026. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Final Planning

Bridges / Tunnels

$40,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
114
Bidding Soon
611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Across the Red River, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.