BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in District 23, Ballenger, Maryland. Conceptual plans call for site work for a water / sewer project.

This project serves as a placeholder for projects pertaining to the ongoing NPDES MS4 permit requirements. As projects are identified, funding will be allocated to the specific projects. Two examples of these projects are stream restorations and stormwater facility retrofits. Facility retrofits are structural stormwater management measures in urban watersheds that help minimize accelerated channel erosion of downstream waterways, reduce pollution loads, promote conditions for improved aquatic habitat and provide increased detention of higher level storm events. Stream restoration re-establishes the general structure, function, and self-sustaining behavior of the stream systems that existed prior to disturbance. A broad range of measures are incorporated into stream restoration projects including removing watershed disturbances that cause stream instability, installing structures and vegetation to protect stream banks from erosion and provide aquatic habitat, reshaping or replacing of unstable stream reaches with appropriately designed functional streams and associated floodplains. As of August 7, 2024, this project is included in the county's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$19,056,800.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
81
Bidding Soon
1,956
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

img_map_placeholder

Multiple Locations, District 23, Ballenger, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.