Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work for a water / sewer project in District 23, Ballenger, Maryland. Conceptual plans call for site work for a water / sewer project.
This project serves as a placeholder for projects pertaining to the ongoing NPDES MS4 permit requirements. As projects are identified, funding will be allocated to the specific projects. Two examples of these projects are stream restorations and stormwater facility retrofits. Facility retrofits are structural stormwater management measures in urban watersheds that help minimize accelerated channel erosion of downstream waterways, reduce pollution loads, promote conditions for improved aquatic habitat and provide increased detention of higher level storm events. Stream restoration re-establishes the general structure, function, and self-sustaining behavior of the stream systems that existed prior to disturbance. A broad range of measures are incorporated into stream restoration projects including removing watershed disturbances that cause stream instability, installing structures and vegetation to protect stream banks from erosion and provide aquatic habitat, reshaping or replacing of unstable stream reaches with appropriately designed functional streams and associated floodplains. This project is included in the county's fy 2025-2030 Capital Improvement Program. As of July 28, 2025, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$19,056,800.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
Multiple Locations, District 23, Ballenger, MD
Related To This Project
District 23, Ballenger, MD
--
District 23, Ballenger, MD
--
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Mar 20 2025
District 23, Ballenger, MD
Bid Date: Jan 16 2025
District 23, Ballenger, MD
Bid Date: Feb 06 2025
District 23, Ballenger, MD
--
District 23, Ballenger, MD
Bid Date: Mar 20 2025
District 23, Ballenger, MD
Bid Date: Jun 20 2024
District 23, Ballenger, MD
Bid Date: Jun 13 2024
District 23, Ballenger, MD
Bid Date: Jun 13 2024
District 23, Ballenger, MD
Bid Date: Jun 06 2024
District 23, Ballenger, MD
Bid Date: Apr 30 2024
District 23, Ballenger, MD
Bid Date: Feb 15 2024
District 23, Ballenger, MD
Bid Date: Mar 24 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
