BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Portland, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Yellowbird Road Sidewalk and Guardrail Improvements at the Portland International Jetport Question Deadline 09/12/2024 at 12:00 PM ET Questions regarding this bid shall be made in writing only and be sent to the Purchasing Office, being received no later than five working days prior to the bid opening, They may be mailed, e-mailed to slchapin@portlandmaine.gov or faxed to 207-874-8652. Location: Portland International Jetport 1001 Westbrook Street Portland, Maine 04102 Outline of Work: Traffic control, earthwork, paving, pavement markings, signage, sidewalk construction, riprap slope construction, chain-link fencing, roadway widening, demolition of existing features, improvements and relocation of existing guardrail, installation of new guardrail, general conditions, erosion control, work shown on project plans and as required to complete the project, coordination with Jetport Operation and compliance with FAA requirements. Bonds: A bid bond is not required for the bid. 100% payment and performance bonds are required by the successful bidder prior to execution of a contract Contractor shall be fully aware of the site conditions, always maintaining one-lane of traffic, providing traffic flaggers and traffic signage (MUTCD compliant), height restrictions adjacent to active runway and working adjacent to steep slope areas. In addition, the project location is adjacent to the threshold for runway 18. Contractor will have restricted height limitations for equipment and shall limit equipment heights of not more than 20 feet and as directed by Jetport Operations and Air Traffic Control. Equipment shall be flagged per FAA requirements The Contractor shall mobilize no earlier than April 12, 2025, and shall complete the work in its entirety by June 20, 2025. Liquidated damages will not be assessed, however, if the Contractor is determined by the Jetport to not be responsive, the owner reserves the right to withhold money from the Contractor until such work is completed to the satisfaction of the owner and/or terminate the contact retaining sufficient funds to complete the project

Award

Roads / Highways

$271,234.00

Public - City

Paving, Site Work

10

8

6

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
43
Bidding Soon
781
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.