Demolition, site work and new construction of a water / sewer project in Pinckneyville, Illinois. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of October 15, 2024 bids were rejected, but no definite date for the rebid. The Project includes the following Work: Demolition of the existing elevated tank, installation of a new 300,000 - gallon single pedestal tank including all piping, electrical and appurtenances required to complete the project. Bidders must secure their information as to the condition of the site and all local conditions affecting the work prior to submitting their proposals. Bidders are notified that the price bid must include everything as described in the specifications and shown on the drawings. No extra of any kind will be allowed unless ordered in writing by the Owner. All questions shall be directed to Jesse S. Maynard at HMG Engineers, Inc. at (618) 317-2677 or jmaynard@hmgengineers.com. Questions received less than seven days prior to the date for opening of Bids may not be answered. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents, Owner: City of Pinckneyville The Work will be substantially complete within 360 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 390 days after the date when the Contract Times commence to run.

Final Planning

Water / Sewer

$2,992,000.00

Public - City

Demolition, New Construction, Site Work

10

27

3

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
43
Bidding Soon
757
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

April 15, 2025

img_map_placeholder

Mason St, Pinckneyville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.