BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work and paving for a mixed-use development in Cheyenne, Wyoming. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 7th, 2025, bids were cancelled. No definite date for the rebid.** The Project Consists of Constructing a Chip Seal Coat and/or Slurry Seal Coat Around the Sherard Water Treatment plant, Driveway, and Pavement Around Old Sherard, As well as, the Parking Lot for The operations & Maintenance building, Including the South lot of the Employee Parking .bids Will Be Received for a Single prime Contract Bids Shall Be Ona Lump Sum and Unit Price Basis, with Additive Alternate Bid Items as Indicated in the Bid Form. bid Security Shall Be Furnished In accordance With the Instructions to Bidders. A goal of BOPU is to reduce the workers' compensation loss ratio of injury claims cost versus premiums paid by 10% per year. Question Deadline 09/26/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered

Final Planning

Sidewalks / Parking Lot

$338,821.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
6
Bidding Soon
495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

May 7, 2026

Project location map

1821 Happy Jack Rd, Cheyenne, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.