BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Owatonna, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Vine Street Parking Lot. All bids must be accompanied by an affidavit certifying that, (1) the bid has been arrived at by the bidder independently, and has been submitted without collusion with, and without agreement, understanding or planned common course of action with any other vendor of materials, suppliers, equipment or service described in the invitation to bid, designed to limit the independent bidding or competition, (2) the contents of the bid has not been communicated by the bidder or its employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished with the bid, and will not be communicated to any such person prior to the official opening of the bid. A Proposal Guaranty for at least 5% of the total bid amount shall accompany the proposal as outlined in the project documents. A bidder's bond shall include a certified copy of the power of attorney. The affidavit shall be signed by the bidder if he is an individual, by a partner if the bidder is a partnership, or by an officer or employee of the corporation having power to sign in its behalf, if the bidder is a corporation. The affidavit shall state that the person signing it has fully informed himself regarding the accuracy of the statements made in it. Any bid not accompanied by this affidavit will be rejected. The Council reserves the right to, (1) defer acceptance of any bid, not to exceed 40 days, (2) reject any or all bids, (3) waive any informalities and technicalities. Description: The extent of the work involved is furnishing all labor and materials for the reconstruction of the Vine Street Parking Lot together with related subsidiary and incidental work: The project consists of removal of bituminous and concrete pavement, curb and gutter, lighting, and sidewalk and the construction of bituminous and concrete pavement, curb and gutter, lighting, pedestrian ramp, sidewalk, storm sewer, underground storm water infiltration facility, and associated grading The Owner is requesting if there will be alternate lump sum deduction if the project were to be constructed in one phase rather than two. Providing an alternate lump sum deduction is not a requirement.

Award

Sidewalks / Parking Lot

$1,086,477.00

Public - City

Outdoor Lighting, Paving, Site Work

44

8

2

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
50
Bidding Soon
757
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 3, 2024

img_map_placeholder

E Vine St, Owatonna, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.