Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 28, 2024 at 8:00 PM

Updated September 16, 2026

Site work for a bridge / tunnel in Blandford-Blenheim, Ontario. Completed plans call for site work for a bridge / tunnel.

The following is a general but not necessarily a complete description of the works: The Contract involves the rehabilitation of a 54.85 metre three span bridge over Nith River on Township Road 5. Components of the work include concrete removals over the bridge deck, expansion joint replacement, concrete overlay, replacement of approach guide rail, hot mix asphalt paving and epoxy anti-skid deck coating. Documents can be obtained at: https://blandfordblenheim.bidsandtenders.ca

Bid Results

Bridges / Tunnels

$544,325.00

Public - City

Site Work

8

6

8

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
251
Bidding Soon
3,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 9, 2024

Project location map

Township Rd 5, Blandford-Blenheim, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed