BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Pryor, Oklahoma. Completed plans call for site work for a power facility.

Transmission Line Construction - Herron to PRY-9 161kV Transmission Line Project. a) This project shall begin work on or before: b) This project shall be completed on or before: Scope of Work 2.1 Location This contract consists of constructing two 161kV Transmission Lines located between GRDA Herron Switch station and Customers PRY-9 Substation located in Mayes County Oklahoma. The Contractor and his subcontractors shall follow all applicable OSHA andGRDA Safety Manual rules. In addition, the contractor shall have at least one person, on site that is OSHA 30 certified, as a minimum. In addition, the Contractor shall have in place a safety program that is specific to this type of construction, including any site-specific safety measures needed. The details of the program shall be included in the proposal. The contractor is responsible for ensuring that all subcontractors also adhere to all OSHA and GRDA safety standards. The Contractor on-site Supervisor shall provide a weekly report to the GRDA Construction Coordinator/inspector, with daily safety talks, and will include any near misses, safety issues, etc. This shall be provided by Monday at noon the following week. Electric power will NOT be provided for this construction by GRDA. All temporary connections for electricity shall be subject to the approval of GRDA. All temporary lines necessary for the Contractor's execution of the work will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to GRDA and shall be removed by the Contractor in like manner at his expense prior to completion of the construction. The contractor's temporary electrical power, if furnished by GRDA, will be 60 Hz, single phase, 240/120-volt AC. Question Deadline 08/17/2024 at 3:00 PM CT Prestressing of conductor, OHGW or OPGW will not be permitted. Should the conductor, OHGW or OPGW be accidentally overstressed, it may be rejected at the discretion of GRDA and the Contractor will assume all costs associated with the wire.

Award

Power Plant

$498,100.00

Public - State/Provincial

Site Work

19

14

34

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
60
Bidding Soon
818
All Active Projects
356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

September 18, 2024

img_map_placeholder

635 OK-69A, Pryor, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.