BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santa Monica, California. Completed plans call for site work for a stadium; for paving for a stadium; educational facility; educational facility; sidewalk / parking lot; and sidewalk / parking lot.

SMC Corsair Stadium Concrete Restoration. Question Deadline 08/29/2024 2:00 PM (PDT) Questions must be submitted Online Q&A Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value 420,000.00 Start/Delivery Date TBD, estimate early November 2024 Project Duration 90 calendar days -If submitting Certified or Cashier's check in lieu of bid bond. Originals of all submitted bid documents will be required of awarded contractor, if award is made. -SMC reserves the right to waive any irregularities, award in whole or in part, or cancel this bid. Bidder, and any sub(s), must hold valid specified CSLB contractor licenses and CADIR registration. CADPH lead training and abatement certifications and clearances as well as Ongoing BLL Data, Respiratory Fit Test, and Physician Written Opinion are required for all contractor employees on the jobsite. This is a prevailing wage project subject to CADIR certified payroll requirements. Scope of Services In accordance with bid documents, furnish all prevailing wage labor, equipment, supplies, materials, services and transportation necessary for removing all deteriorated finish surfaces needed to properly complete repairs identified in the Contract Documents; repairing all spalling concrete of existing walls and horizontal surfaces per structural repair details; treating exposed rebar prior to applying new concrete patching and/or finishes; providing all structural repairs identified in the drawings; sealing all concrete cracks with specified sealers; applying specified concrete sealers over repaired concrete spalling areas (deck and vertical wall surfaces) as identified; re-securing all galvanized guardrails in concrete with epoxy where spalling created guardrail instability. Scope of work shall include all work identified in the Contract Document drawings, specifications and supplemental documents necessary to provide a complete and operable, watertight system.

Award

Educational

$317,675.00

Public - City

Paving, Site Work

20

15

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
102
Bidding Soon
2,194
All Active Projects
859
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2024

October 3, 2024

img_map_placeholder

1900 Pico Blvd, Santa Monica, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.