BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Stockton, California. Completed plans call for site work for a water / sewer project.

The Project consists of the construction of three (3) concrete pads totaling 432 square yards, including excavation, subgrade preparation, forming, and reinforcement, for the permanent storage of stoplogs and racks. The work also includes transporting of the stoplogs from a storage site in Tracy, California, to the project site and onto the newly constructed pads. Bidders shall be skilled, regularly engaged and licensed in the general class or type of work specified and possess a valid California Class "A" Contractor's License. In accordance with the provisions of the State of California Labor Code 1770 et seq., the Director of the Department of Industrial Relations (DIR) has ascertained the general prevailing rate of wages applicable to the Work to be done. Bidders shall be registered with the DIR pursuant to Labor Code1725.5 to be qualified to bid on or engage in the performance of work under this Contract. These requirements extend to all Subcontractors to be listed on a bid proposal or engage in the performance of work under this Contract. This contract is subject to the California Air Resources Board Off-Road Diesel Regulation (Title 13 CCR 2449). The successful bidder will be required to submit copies of the valid Certificates of Reported Compliance for the fleet selected to perform work for this bid and any listed subcontractors. The bid shall be accompanied by a Bid Guarantee of not less than ten (10) percent of the Base Bid Amount. Technical, construction, and Project inquiries and questions should be directed to Joseph Prescott (Jprescott@ksninc.com) or David Carr (dcarr@ksninc.com) at (209) 946-0268 Estimated cost of project construction is $500,000. for the Stoplog Storage Foundation for the Smith Canal Gate Project Bids will be received for a single prime Contract. Bids shall be on a unit price basis. Award will be based on lowest price of the base bid items.

Award

Water / Sewer

$435,688.00

Public - County

Site Work

46

14

7

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
92
Bidding Soon
1,920
All Active Projects
800
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

1404 W Weber Ave, Stockton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.