BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Gladstone, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replace an existing 18-foot-wide by 22.3-foot-span by 7.3-foot-rise concrete bridge with wingwalls over North Branch Stutt's Creek with a new 18-foot-wide by 36-foot-span by SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK C.1 SCOPE OF CONTRACT Replace an existing 18-foot-wide by 22.3-foot-span by 7.3-foot-rise concrete bridge with wingwalls over North Branch Stutt's Creek with a new 18-foot-wide by 36-foot-span by 5.7-foot-rise timber clear span bridge with wingwalls. C.2 PROJECT LOCATION From Hwy M-28 / Hwy M-94 Intersection in Shingleton, Michigan, head South on Hwy M-94 For 0.8 miles, then turn right onto Hanlley Truck Trail. Continue on Hanley Truck Trail for 1.6 milesto FR 2251. Then continue on FR 2251 for 1 mile to the bridge location. C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $500,000 and $1,000,000 5.7-foot-rise timber clear span bridge with wingwalls. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - Federal

Demolition, New Construction, Paving, Site Work

19

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
69
All Active Projects
20
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 4, 2024

img_map_placeholder

To Be Determined, Gladstone, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.